Special Tender for Distributed Electrochemical Energy Storage Systems in the Distribution Network of Guangdong Power Grid Company in 2025

Published: Apr 16, 2025 18:05

Polaris Energy Storage Network has learned that recently, Guangdong Power Grid Corporation has issued a special tender announcement for the 2025 distributed electrochemical energy storage system for the distribution network (Project No.: CG0300022002022130). This tender includes one material category for the distributed electrochemical energy storage system for the distribution network, with a maximum bid price of 23,470,500 yuan.

1. Tender Conditions

This tender project is the special tender for the 2025 distributed electrochemical energy storage system for the distribution network of Guangdong Power Grid Corporation. The bid inviter is Guangdong Power Grid Co., Ltd. The project funds are self-raised, with a funding ratio of 100%, and the funds have been secured. The project has met the tender conditions and is now open for public bidding.

2. Project Overview and Tender Scope

2.1 Project Summary: The special tender for the 2025 distributed electrochemical energy storage system for the distribution network of Guangdong Power Grid Corporation includes one material category for the distributed electrochemical energy storage system.

2.2 Tender Scope: The special tender for the 2025 distributed electrochemical energy storage system for the distribution network of Guangdong Power Grid Corporation includes one material category for the distributed electrochemical energy storage system. The project list is detailed in the "Procurement Plan Details Table." The bid winner must unconditionally supply the goods based on actual needs and may not raise any objections.

2.3 Tender Project Location: Guangdong Province.

2.4 Qualification Review Method: Post-qualification review.

2.5 Tender Classification: Special.

2.6 Bid List and Package Situation:

Remarks:

(1) "√" indicates that the subject matter organizes and carries out the work, while "×" indicates that the subject matter does not organize and carry out the work.

(2) Except for unrestricted special packages, a bidder can win no more than the maximum number of packages in one category/subject.

(3) This project sets a maximum bid price.

(4) The special tender procurement details and the maximum bid price for each package are detailed in the attachment "Procurement Plan Details Table." The final bid price (including individual item prices) must not exceed the maximum bid price.

2.7 Other Key Elements:

1. Project Category: Goods

2. Cybersecurity Review: According to the national "Cybersecurity Review Measures," products or services that the bid inviter pre-judges as requiring submission to the National Cybersecurity Review Office for cybersecurity review, the bid winner/candidate is obligated to cooperate with the cybersecurity review. The required submission materials must be provided within 3 working days upon receiving the bid inviter's notice. The bid winner/candidate must not illegally obtain user data or control and manipulate user equipment using the convenience of providing products and services. Without justifiable reasons, the bid winner/candidate must not interrupt product supply or necessary technical support services. The bid winner can only be determined after the products and services pass the cybersecurity review. If the bid winner's product components do not meet the cybersecurity review requirements, they must complete the replacement of related components for free and provide the evaluation report as required by national ministries. If the reliability evaluation is not conducted or alternative products cannot be provided, the bid inviter has the right to terminate the contract. The remaining share of the terminated contract supplier will be allocated to other package winners of the same subject or re-procured as per the tender document. All bidders participating in this tender are deemed to have committed to the above matters. The bid winner/candidate shall bear the relevant responsibilities and consequences for any losses caused by failing the cybersecurity review. The bid inviter reserves the right to pursue responsibility for any direct or indirect losses caused by the bid winner/candidate's failure to fulfill cybersecurity review obligations (including non-cooperation, intentional concealment, providing false submission materials, etc.). For subjects involving cybersecurity, bidders should commit that the components used meet the national cybersecurity review requirements.

3. Bidder Qualification Requirements

Remarks: If there are different categories of equipment materials within a package, the bidder must meet the commercial and technical qualification requirements for each category of equipment materials within the package to be considered as meeting the qualification requirements for that package.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
8 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
8 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
8 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
8 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
8 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
8 hours ago
Special Tender for Distributed Electrochemical Energy Storage Systems in the Distribution Network of Guangdong Power Grid Company in 2025 - Shanghai Metals Market (SMM)