Yunrongqi and Qualcomm Collaborate to Develop Advanced Intelligent Driving Solutions on Snapdragon Ride Platform

Published: Apr 10, 2025 20:44
【Yunrongqi and Qualcomm Announce Cooperation】On April 9, it was reported that Yunrongqi and Qualcomm Technologies announced a technical cooperation on April 8. They will jointly develop several high-level intelligent driving solutions supporting ADAS/AD functions based on the Snapdragon Ride platform (SA8650). These solutions will include both lidar-based and pure vision-based solutions, capable of supporting advanced intelligent driving functions such as urban NOA, highway NOA, and automatic parking, and can be adapted to both fuel and new energy vehicles.
The two parties will optimize the end-to-end (E2E) bird's-eye view (BEV) and Transformer AI models on the Snapdragon Ride platform to simulate the human neural network, enabling the intelligent driving system to more naturally understand the traffic environment and driving logic. The end-to-end model architecture helps the intelligent driving system understand human driving culture, for example, in the case of road construction blockages, it can analyze the road conditions in real-time and execute strategies for borrowing lanes. In terms of safety, Yunrongqi has optimized the algorithms under complex lighting conditions such as strong light, dark light, and backlight, enhancing the perception ability of the pure vision solution in extreme environments.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
5 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
5 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
5 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
5 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
5 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
5 hours ago
【Yunrongqi and Qualcomm Announce Cooperation】On April 9, it was report - Shanghai Metals Market (SMM)