Green Hydrogen Project Tracking - Tender for the Industrialisation Demonstration Project of Hydrogen-Produced Green Methanol by Guofa Green Energy (Wusu) New Energy Technology Co., Ltd.

Published: Apr 2, 2025 14:38

On March 28, Guofa Green Energy (Wusu) New Energy Technology Co., Ltd. issued an invitation for tender for the EPC general contracting of the 300,000 mt/year green methanol industrialisation demonstration project using hydrogen.

Information shows that the project involves the construction of a production line with an annual capacity of 24,700 mt of green hydrogen and 300,000 mt of green methanol, along with supporting facilities.

Tenderer: Guofa Green Energy (Wusu) New Energy Technology Co., Ltd.

Tender Content: EPC general contracting for the 300,000 mt/year green methanol industrialisation demonstration project using hydrogen.

This tender accepts consortium bids. Enterprises that cannot meet the qualification requirements individually may form a consortium to participate, with no more than two units in the consortium, and a consortium agreement must be provided.

Guofa Green Energy (Wusu) New Energy Technology Co., Ltd. is a wholly-owned subsidiary of Guofa City Investment (Shaanxi) Energy Development Co., Ltd., established in 2024 and located in Tacheng Prefecture, Xinjiang Uygur Autonomous Region. It is primarily engaged in the production and supply of electricity and heat. The company has a registered capital of 10 million RMB.

The shareholders of Guofa City Investment (Shaanxi) Energy Development Co., Ltd. are Guofa City Investment (Hainan) Holding Group Co., Ltd. and Xinjiang Zhonghang Future Hydrogen Energy Technology Co., Ltd.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
11 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
11 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
11 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
11 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
11 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
11 hours ago
Green Hydrogen Project Tracking - Tender for the Industrialisation Demonstration Project of Hydrogen-Produced Green Methanol by Guofa Green Energy (Wusu) New Energy Technology Co., Ltd. - Shanghai Metals Market (SMM)