【SMM Analysis】SMM's total lithium carbonate production in March 2025 increased by 23% MoM and 85% YoY, reaching a record high.

Published: Mar 31, 2025 17:50
In March 2025, SMM's total lithium carbonate production hit a new high, up 23% MoM and 85% YoY. The main reasons were the resumption of normal production after maintenance at upstream lithium chemical plants and the continuous ramp-up of some production lines, which significantly boosted domestic lithium carbonate output. By raw material type, the total production of lithium carbonate derived from spodumene increased by 24% MoM. Most lithium chemical plants resumed normal production in March after the Chinese New Year maintenance, and the continuous ramp-up of some lower-cost production lines significantly boosted the output of lithium carbonate derived from spodumene. Although some small and medium-sized lithium chemical plants using lepidolite had reduced production due to the continuous decline in lithium carbonate prices, the strong supplementation from leading lithium chemical plants still led to a significant increase in the production of lithium carbonate derived from lepidolite, up 26% MoM. Although the temperature in salt lake regions remained relatively low, production had increased from the previous low levels, with an overall increase of 13% MoM. Lithium chemical recycling plants generally resumed production in March, but due to the low base, the MoM increase was significant, at around 31%. Although the persistent surplus of lithium carbonate continued to drag prices down, the current production structure is still dominated by integrated enterprises, with higher and more stable operating rates. Additionally, the continuous ramp-up of some relatively lower-cost production lines could supplement the high marginal cost production cuts. Overall, domestic lithium carbonate production in April is expected to remain stable at high levels, with fluctuations within 1%-2%.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
1 min ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
1 min ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
3 mins ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
3 mins ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
4 mins ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
4 mins ago
【SMM Analysis】SMM's total lithium carbonate production in March 2025 increased by 23% MoM and 85% YoY, reaching a record high. - Shanghai Metals Market (SMM)