Copper Prices Remain High,抑制 Consumption but Potential for New Orders if Prices Decline

Published: Mar 27, 2025 18:24
According to SMM, copper prices remained high recently, and the price difference between primary metal and scrap widened, consistently suppressing the consumption of refined copper rod. However, copper prices once reached 81,500 yuan/mt today, leading to a certain degree of consumption release. If copper prices can further retreat, more new orders may be released.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Yunnan Copper: H1 net profit up 29.05% YoY, copper cathode output 836,500 mt, gold 15.2 mt
19 mins ago
Yunnan Copper: H1 net profit up 29.05% YoY, copper cathode output 836,500 mt, gold 15.2 mt
Read More
Yunnan Copper: H1 net profit up 29.05% YoY, copper cathode output 836,500 mt, gold 15.2 mt
Yunnan Copper: H1 net profit up 29.05% YoY, copper cathode output 836,500 mt, gold 15.2 mt
19 mins ago
Data: SHFE, DCE market movement (Sep 04)
38 mins ago
Data: SHFE, DCE market movement (Sep 04)
Read More
Data: SHFE, DCE market movement (Sep 04)
Data: SHFE, DCE market movement (Sep 04)
The following table shows the ferrous and nonferrous metals movement on the SHFE and DCE on 04 Sep , 2026
38 mins ago
Vizsla Copper Intersects 49.2m at 4.7% CuEq at Alaska’s Palmer Project
1 hour ago
Vizsla Copper Intersects 49.2m at 4.7% CuEq at Alaska’s Palmer Project
Read More
Vizsla Copper Intersects 49.2m at 4.7% CuEq at Alaska’s Palmer Project
Vizsla Copper Intersects 49.2m at 4.7% CuEq at Alaska’s Palmer Project
Vizsla Copper has reported initial assay results from its ongoing 12,250-metre diamond drilling programme at the Palmer copper-zinc VMS project in southeast Alaska, confirming a broad high-grade copper-zinc intersection within South Wall Zone 1. Drill hole CMR26-199 returned 49.2 metres grading 4.7% CuEq, comprising 3.05% copper, 4.85% zinc, 21.88 g/t silver and 0.33 g/t gold. The interval included 27.0 metres at 8.4% CuEq, including a higher-grade section of 13.1 metres at 10.3% CuEq, containing 9.03% copper, 1.83% zinc, 42.74 g/t silver and 0.78 g/t gold. A second hole, CMR26-201, confirmed high-grade mineralisation further downdip, returning 40.4 metres at 3.0% CuEq, including 25.6 metres at 3.7% CuEq and 12.2 metres at 4.9% CuEq. Vizsla said the two holes confirm continuity of the high-grade copper core at South Wall Zone 1 and extend the mineralised system downdip. Earlier drilling had identified the same 49.2-metre mineralised interval visually, with an estimated true thickness of approximately 39 metres, before assay results became available. Following encouraging early results, Vizsla expanded its 2026 Palmer drilling programme from 10,000 metres to approximately 12,250 metres. Current drilling is focused on the HG Prospect and Palmer Extension Target, while results from an additional 15 drill holes across the HG, AG, South Wall Zones 2–3 and Waterfall targets are expected between late September and early November, subject to laboratory turnaround times. The latest assays are significant because they convert earlier visual observations at Zone 1 into confirmed high-grade copper-zinc results and demonstrate continuity of the mineralised system downdip. However, Palmer remains at the exploration and resource-growth stage, meaning the results do not represent an immediate increase in copper supply. The near-term focus will be on whether the remaining 2026 drilling can further expand the high-grade core and support future growth of the project’s existing resource base.
1 hour ago