【SMM Analysis】Weekly Price Trend Analysis of ESS Battery Cabin, 3.20-3.27

Published: Mar 27, 2025 16:56
【SMM Analysis】ESS battery cell prices remained stable this week, with no significant fluctuations observed in the price range of mainstream models.

This week, ESS battery cell prices remained stable, with no significant fluctuations in the price range of mainstream models. Among them, the price range for 280Ah ESS battery cells was 0.277-0.33 yuan/Wh, while the price range for 314Ah ESS battery cells was 0.27-0.34 yuan/Wh. However, the price of 100Ah battery cells has shown an upward trend recently due to increased demand. Recently, the R&D of large-capacity ESS battery cells of 500Ah+/600Ah+ has accelerated, but the impact on prices is limited in the short term. Cost side, lithium carbonate prices are approaching the support level of 70,000 yuan/mt, with limited further downside room. The pressure from rising raw material prices for anodes may be transmitted to the battery cell end, and it is expected that battery cell costs will increase MoM in April, but the price increase for ESS battery cells will be limited.

SMM New Energy Industry Research Department

Cong Wang 021-51666838

Rui Ma 021-51595780

Disheng Feng 021-51666714

Yanlin Lyu 021-20707875

Zhicheng Zhou 021-51666711

Haohan Zhang 021-51666752

Zihan Wang 021-51666914

Jie Wang 021-51595902

Yang Xu 021-51666760

Bolin Chen 021-51666836

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
10 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
10 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
10 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
10 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
10 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
10 hours ago
【SMM Analysis】Weekly Price Trend Analysis of ESS Battery Cabin, 3.20-3.27 - Shanghai Metals Market (SMM)