Avita 012 Global Limited Edition Launched: Priced at 700,000 Yuan, Equipped with CATL Batteries

Published: Mar 26, 2025 10:11
【Equipped with CATL Batteries! Avita 012 Global Limited Edition Priced at 700,000 Yuan】On March 25, Avita brand announced the official launch of its limited-edition model Avita 012, co-designed with designer Kim Jones, with an official指导价 of 700,000 yuan and a global limit of 700 units.
The model was jointly created by Avita and Kim Jones, Artistic Director of Dior Men and Artistic Director of Fendi Women's and Haute Couture. It maintains the overall size and basic design of the current model but features exclusive details such as liquid silver paint and 21-inch forged mirror-finish wheels. The body is adorned with exclusive badges, and the B-pillar badge can be customized with a personal emblem. In terms of power, the Avita 012 is equipped with Huawei's DriveONE dual-motor electric system, with a total power output of 402 kW and a peak torque of 687 N·m, reaching a top speed of 220 km/h and accelerating from 0 to 100 km/h in just 3.8 seconds. The vehicle uses CATL's Kirin battery, supporting a peak charging current of over 700 A and a peak charging power of over 480 kW. The 93.4 kWh battery pack offers a CLTC electric range of 650 km, and can be charged to 80% SOC in just 10 minutes.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
20 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
20 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
20 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
20 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
20 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
20 hours ago