【SMM Hydrogen Policy Update】Beijing: Implementation Rules for Promoting the Scrappage and Renewal of Old Trucks and Medium and Large Buses with National IV and Below Emission Standards in Beijing

Published: Mar 26, 2025 09:13

Recently, the Beijing Municipal Ecology and Environment Bureau and six other departments jointly issued the "Implementation Rules for Promoting the Scrappage and Renewal of Old Trucks and Medium and Large Buses with China IV and Below Emission Standards in Beijing" (hereinafter referred to as the "Rules"), encouraging the scrappage and renewal of old trucks and medium and large buses with China IV and below emission standards in the city. Depending on the type of vehicle scrapped and renewed, subsidies ranging from 6,000 yuan to 170,000 yuan can be applied for.

The objects of subsidies under these implementation rules include: owners of old trucks or medium and large buses with China IV and below emission standards who scrap and renew them as new energy vehicles. Owners who only scrap old trucks with China IV emission standards. Businesses that only purchase new energy cold chain trucks.

Among them, "old trucks or medium and large buses with China IV and below emission standards" refer to diesel trucks registered in Beijing with an ex-factory date or initial registration date between July 1, 2013, and July 31, 2015, as well as medium and large diesel passenger vehicles registered in Beijing with an ex-factory date or initial registration date between January 1, 2006, and July 31, 2015.

"New energy vehicles" refer to pure electric and hydrogen fuel cell vehicles purchased from Beijing auto sales enterprises and issued with the city's "Uniform Invoice for Motor Vehicle Sales."

"New energy cold chain trucks" refer to pure electric and hydrogen fuel cell cold chain trucks purchased from Beijing auto sales enterprises and issued with the city's "Uniform Invoice for Motor Vehicle Sales" by road freight businesses that have obtained road transport operation permits in Beijing and have had the "refrigeration and preservation" business scope before the release date of the "Rules" (excluding the release date).

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
17 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
17 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
17 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
17 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
17 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
17 hours ago
【SMM Hydrogen Policy Update】Beijing: Implementation Rules for Promoting the Scrappage and Renewal of Old Trucks and Medium and Large Buses with National IV and Below Emission Standards in Beijing - Shanghai Metals Market (SMM)