BYD Recalls 6,843 Fangchengbao 5 Plug-in Hybrids Over Safety Issues

Published: Mar 21, 2025 20:14
[BYD Recalls 6,843 Units of Fangchengbao 5 Plug-in Hybrid Vehicles]

Recently, BYD Auto Industry Co., Ltd. filed a recall plan with the State Administration for Market Regulation in accordance with the requirements of the "Regulations on the Recall of Defective Automotive Products" and the "Implementation Measures for the Regulations on the Recall of Defective Automotive Products." The company decided to recall certain Fangchengbao 5 plug-in hybrid vehicles produced between October 16, 2023, and February 1, 2024, totaling 6,843 units, starting from January 24, 2025. For some of the vehicles within this recall, due to manufacturing issues, the bolts inside the integrated dual-motor controller's electrical connectors may not be properly tightened, leading to loosening and arcing at the bolt connection points during vehicle use. In extreme cases, this could result in smoke and fire, posing safety hazards. BYD Auto Industry Co., Ltd. will authorize Shenzhen Fangchengbao New Energy Vehicle Co., Ltd. to replace the integrated dual-motor controllers for the recalled vehicles free of charge, to eliminate the safety risks.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
4 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
4 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
4 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
4 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
4 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
4 hours ago