【SMM Data】2025 January-February LiPF6 Import and Export Data

Published: Mar 21, 2025 15:55
[SMM Data: LiPF6 January-February 2025 Import and Export Figures] In January 2025, China's cumulative LiPF6 exports reached 2,430 mt, up 13.5% MoM, while in February, the cumulative exports were 1,486 mt, down 38.8% MoM.
According to Chinese customs data, in January 2025, China's cumulative LiPF6 exports were 2,430 mt, up 13.5% MoM, and in February, the cumulative exports were 1,486 mt, down 38.8% MoM. In January, China's cumulative LiPF6 imports were 0.002 mt, and in February, they were 8.134 mt. Overall, foreign lithium battery manufacturers saw an increase in raw material procurement volume in January, with a slight rise in demand for lithium batteries. In February, the demand for lithium battery products abroad was affected by the Chinese New Year holiday, leading to a decrease in demand. Note: For any supplements or corrections to the details mentioned in this article, please contact us at any time. Contact information is as follows: Tel 021-20707858 Xuejie Hu, thank you! SMM New Energy Research Team Cong Wang 021-51666838 Lingying Zhang 021-51666775 Xiaodan Yu 021-20707870 Rui Ma 021-51595780 Ying Xu 021-51666707 Disheng Feng 021-51666714 Yujun Liu 021-20707895 Yanlin Lv 021-20707875 Xianjue Sun 021-51666757 Ye Yuan 021-51595792 Chensi Lin 021-51666836 Zhicheng Zhou 021-51666711

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
33 mins ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
33 mins ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
36 mins ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
36 mins ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
37 mins ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
37 mins ago