US Dollar Index Rebounds, Copper Prices Retreat; BC Copper Most-Traded Contract Closes Lower [SMM BC Copper Commentary]

Published: Mar 21, 2025 15:47
SMM BC Copper Commentary: US Dollar Index Rebound Causes Copper Prices to Retreat, BC Copper Most-Traded Contract Closes Lower SMM March 21st: The most-traded BC copper 2505 contract opened at 72,510 yuan/mt today. It closed with a negative performance, its upper shadow piercing the upper Bollinger Band...
SMM March 21 Report: Today, the most-traded BC copper 2505 contract opened at 72,510 yuan/mt and closed with a negative candle, with the upper shadow piercing through the upper Bollinger band. Overnight, the most-traded BC copper 05 contract opened lower with a gap and fluctuated within the range of 72,260-72,630 yuan/mt; during the morning trading session, the futures market hit a high of 72,970 yuan/mt before pulling back as shorts increased their positions; in the afternoon trading session, with bears dominating, the most-traded BC copper 05 contract continued to weaken, hitting bottom at 71,770 yuan/mt, and finally closed at 71,900 yuan/mt, down 680 yuan/mt, or 0.94%, mainly due to longs reducing their positions. Open interest reached 11,248 lots, a decrease of 43 lots from the previous trading day, while trading volume was 9,076 lots, a reduction of 570 lots from the previous trading day.

Macro side, as macro sentiment was digested, the overall market atmosphere was weak during the day, and the US dollar index rebounded, putting pressure on copper prices, which adjusted and closed lower in a weak range.

The SHFE copper 2505 contract closed at 80,610 yuan/mt. If calculated based on the BC copper 2505 contract price of 71,900 yuan/mt, the post-tax price would be approximately 81,247 yuan/mt. The price spread between the SHFE copper 2505 contract and the BC copper 2505 contract was -637 yuan/mt, maintaining an inverted spread but narrowing compared to the previous trading day.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
SHFE Approves Warehouse Capacity Adjustments for Copper, Aluminum, and Zinc Futures in Shanghai
12 mins ago
SHFE Approves Warehouse Capacity Adjustments for Copper, Aluminum, and Zinc Futures in Shanghai
Read More
SHFE Approves Warehouse Capacity Adjustments for Copper, Aluminum, and Zinc Futures in Shanghai
SHFE Approves Warehouse Capacity Adjustments for Copper, Aluminum, and Zinc Futures in Shanghai
On September 2, the Shanghai Futures Exchange (SHFE) announced that it had approved Shanghai Yuqiang Supply Chain Management Co., Ltd. to adjust its designated warehouse capacity for copper, aluminum and zinc futures. At the storage site at No. 3501 Gonghe New Road, Shanghai, the company will cancel its copper and aluminum futures storage qualifications, while its approved zinc futures warehouse capacity will remain unchanged at 20,000 tonnes. At the site at No. 2222 Jichuan Road, Minhang District, Shanghai, its zinc futures storage qualification will be canceled, while approved capacity will be adjusted to 45,000 tonnes of copper and 5,000 tonnes of aluminum.
12 mins ago
Eldorado Evaluates 43% Mill Expansion at McIlvenna Bay as Mine Nears Commercial Production
15 mins ago
Eldorado Evaluates 43% Mill Expansion at McIlvenna Bay as Mine Nears Commercial Production
Read More
Eldorado Evaluates 43% Mill Expansion at McIlvenna Bay as Mine Nears Commercial Production
Eldorado Evaluates 43% Mill Expansion at McIlvenna Bay as Mine Nears Commercial Production
Eldorado Gold is evaluating a 43% expansion of processing capacity at the McIlvenna Bay copper-zinc mine in Saskatchewan, from 4,900 tpd to about 7,000 tpd, alongside a potential silver-lead circuit. More than 400,000 tonnes of material are available for processing as the operation ramps toward commercial production in Q3 2026. The existing feasibility plan targets average life-of-mine copper production of around 41 million lb (18.6kt) per year.
15 mins ago
One and One Secures Over 2,000 Tonnes of Feedstock for New Philippine Metals Recovery Line
16 mins ago
One and One Secures Over 2,000 Tonnes of Feedstock for New Philippine Metals Recovery Line
Read More
One and One Secures Over 2,000 Tonnes of Feedstock for New Philippine Metals Recovery Line
One and One Secures Over 2,000 Tonnes of Feedstock for New Philippine Metals Recovery Line
One and One Green Technologies has secured more than 2,000 tonnes of feedstock, including copper-bearing, nickel and electronic sludge, for its new metals recovery line in the Philippines. Equipment installation is underway and production is targeted before end-2026. The facility will recover copper, nickel, gold and silver from industrial and electronic waste, adding new local processing capacity for complex secondary metal feedstocks.
16 mins ago
US Dollar Index Rebounds, Copper Prices Retreat; BC Copper Most-Traded Contract Closes Lower [SMM BC Copper Commentary] - Shanghai Metals Market (SMM)