Pangang Group Engineering & Technology Co., Ltd. Engineering Service Branch Steel Wire Rope Slings and 10 Other Items Procurement Tender

Published: Mar 21, 2025 15:34
1. Procurement Conditions
This procurement project for 10 items including wire rope slings (PGPGFWHHD250319198597) is initiated by the Material Planning Department of Engineering Service Branch, Pangang Group Engineering & Technology Co., Ltd. The funds for this procurement project come from self-raised sources, and the project is now ready for procurement through a public single-round negotiation.
2. Project Overview and Procurement Scope
2.1 Project Name: 10 Items Including Wire Rope Slings
2.2 Switch to Other Procurement Methods in Case of Failure: No
2.3 For details on the procurement content, scope, and scale, please refer to the attached "Material List Attachment.pdf".
3. Qualification Requirements for Bidders
3.1 This procurement does not allow consortium bids.
3.2 Bidders must meet the following qualification requirements:
(1) Business license for trading companies
(2) Business license for manufacturing companies
3.3 Bidders must meet the following registered capital requirements:
Registered capital for manufacturing companies: 2 million yuan or more
Registered capital for trading companies: 1 million yuan or more
3.4 Bidders must meet the following performance requirements:
For details, see the attachment (if necessary)
3.5 Bidders must meet the following capability, financial, and other requirements:
Financial requirement: Registered capital should be no less than 30% of the total planned price (excluding tax). The registered capital for manufacturing suppliers should be ≥2 million yuan, and for trading suppliers, it should be ≥1 million yuan. (Note: The bidder's registered capital should be no less than 30% of the total planned price (excluding tax). In case of multiple bid winners, the registered capital should be no less than 30% of the section or bid amount (excluding tax). If the supplier's registered capital is less than 30% of the section or bid amount (excluding tax), the principal must provide the tendering company with a review document proving the winning bidder's ability to fulfill the contract before finalizing the bid. The tendering company will archive this document as an attachment in the tendering system.)
Capability requirement: For details, see the attachment (if necessary)
Other requirements: 1. Annual inspection-qualified enterprise qualifications required: (1) Scanned copy of the business license (or duplicate); (2) Scanned copy of the tax registration certificate (or duplicate) (not required if the three certificates are integrated); (3) Scanned copy of the organization code certificate (or duplicate) (not required if the three certificates are integrated). 2. Performance requirement: None.
3.6 For projects that are legally required to undergo tendering, bids from dishonest被执行人投标无效。
4. Obtaining the Procurement Documents
4.1 Those who wish to participate in the bidding should log in to the Ansteel Smart Tendering Platform http://bid.ansteel.cn between 10:00 AM on March 21, 2025, and 1:45 PM on March 24, 2025 (Beijing Time, the same hereinafter) to download the electronic procurement documents.
4.2 To download the electronic procurement documents, users should log into the system, browse the project under "Announcement Information," click "I Want to Bid," complete the relevant information, pay the related fees, and then download the documents.
4.3 Payment methods: personal/corporate online banking, Alipay, WeChat.
4.4 Each set of procurement documents costs 50 yuan and is non-refundable.
5. Submission of Response Documents
5.1 The deadline for submitting response documents is 1:45 PM on March 24, 2025. Bidders should submit their electronic response documents through the designated location on the Ansteel Smart Tendering Platform http://bid.ansteel.cn before the deadline.
5.2 Late submissions will be rejected by the Ansteel Smart Tendering Platform.
5.3 This project does not use bid document preparation software or electronic CA digital certificates (Biaozhengtong APP).
Click to view the tender details:
》Procurement Announcement for 10 Items Including Wire Rope Slings

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Before the holiday, the black chain is unlikely to see a trend-driven market [SMM Steel Industry Chain Weekly Report].
20 hours ago
Before the holiday, the black chain is unlikely to see a trend-driven market [SMM Steel Industry Chain Weekly Report].
Read More
Before the holiday, the black chain is unlikely to see a trend-driven market [SMM Steel Industry Chain Weekly Report].
Before the holiday, the black chain is unlikely to see a trend-driven market [SMM Steel Industry Chain Weekly Report].
This week, ferrous metals were in the doldrums, with coking coal and coke staging a mid-week rise. At the beginning of the week, financial markets experienced sharp fluctuations, dragging down sentiment in the ferrous chain and leading to a pullback in futures. Mid-week, Indonesia's cut to coke production quotas drove coking coal and coke futures to lead the gains, though the impact was more pronounced on thermal coal, while coking coal's rise was largely sentiment-driven and short-lived. In the latter part of the week, finished products continued their seasonal inventory buildup, and support from the raw material side weakened, causing the entire ferrous chain to pull back. In the spot market, with the Chinese New Year holiday approaching, purchasing activity slowed down further, with end-users only making limited, as-needed purchases at low prices.
20 hours ago
MMi Daily Iron Ore Report (February 6)
20 hours ago
MMi Daily Iron Ore Report (February 6)
Read More
MMi Daily Iron Ore Report (February 6)
MMi Daily Iron Ore Report (February 6)
Today, the DCE iron ore futures continued to hit bottom today, with the most-traded contract I2605 closing at 760.5 yuan/mt, down 1.23% from the previous trading day. Spot prices fell by 5–10 yuan/mt compared to the previous trading day.
20 hours ago
[SMM Chromium Daily Review] Inquiries and Transactions Weakened, Chromium Market Showed Mediocre Performance Before the Holiday
21 hours ago
[SMM Chromium Daily Review] Inquiries and Transactions Weakened, Chromium Market Showed Mediocre Performance Before the Holiday
Read More
[SMM Chromium Daily Review] Inquiries and Transactions Weakened, Chromium Market Showed Mediocre Performance Before the Holiday
[SMM Chromium Daily Review] Inquiries and Transactions Weakened, Chromium Market Showed Mediocre Performance Before the Holiday
[SMM Chrome Daily Review: Trading and Inquiries Weakened, Chrome Market Showed Mediocre Performance Before the Holiday] February 6, 2026: Today, the ex-factory price of high-carbon ferrochrome in Inner Mongolia was 8,500-8,600 yuan/mt (50% metal content), flat MoM from the previous trading day...
21 hours ago
Pangang Group Engineering & Technology Co., Ltd. Engineering Service Branch Steel Wire Rope Slings and 10 Other Items Procurement Tender - Shanghai Metals Market (SMM)