Home / Metal News / Green Hydrogen Project Tracking - Zhongtian TrinaSolar Green Hydrogen Project Launches Equipment Tender

Green Hydrogen Project Tracking - Zhongtian TrinaSolar Green Hydrogen Project Launches Equipment Tender

iconMar 21, 2025 11:40
Source:SMM

On March 13, Sinopec Engineering Incorporation issued a tender announcement for the EPC general contracting project of TrinaSolar's Ordos Green Hydrogen Project, covering spherical tanks with a capacity of 800 to 1,900 m3 made of 16MnDR.

The tender scope includes six spherical tanks with a capacity of 800 to 1,900 m3 made of 16MnDR.

Performance requirements: The bidder should have a supply record of at least three spherical tanks with a capacity of no less than 1,000 m3 (the material of the spherical tank is 16MnDR or 07MnNiMoDR and the thickness is no less than 30mm).

It is reported that the total investment in the wind and solar power integrated green hydrogen chemical demonstration project in Wushen Banner, Ordos, is 1.69 billion yuan, and it is expected to start construction in March 2025 and be completed by December 2026. The project adopts an electrolysis water hydrogen production process, with a hydrogen production scale of 30,000 tons per year. It plans to build 48 electrolyzers with a capacity of 1,000 Nm³/h, four electrolyzers with a capacity of 2,000 Nm³/h, and hydrogen storage of 180,000 Nm³ (planning to construct six spherical tanks with a capacity of 1,875 m³).

For queries, please contact William Gu at williamgu@smm.cn

For more information on how to access our research reports, please email service.en@smm.cn

SMM Events & Webinars

All