LME Copper Pulls Back After Hitting $10,000 Mark [Institutional Commentary]

Published: Mar 21, 2025 09:01
(1) US existing home sales in February annualized to 4.26 million units, above the expected 3.95 million and the January figure of 4.08 million. Existing home sales rose 4.2% MoM, beating the forecast of a 3.2% decline and the January decrease of 4.9% MoM.

(2) According to Xinhua News Agency, the US President publicly urged the US Fed to cut interest rates, acknowledging that tariffs would impact the US economy and calling for the Fed to "do the right thing."

(3) As of Thursday, March 20, SMM copper inventories fell by 2,600 mt to 346,400 mt from Monday, and dropped 9,100 mt from the previous Thursday, marking three consecutive weeks of destocking. Inventories have pulled back 30,600 mt from the peak this year and are 48,600 mt lower YoY.

(4) New York copper futures hit a record high. Amid tariff threats, US importers stockpiled copper, pushing the premium of Comex copper futures over LME copper to over $1,200/mt, nearing the record high set in mid-February.

(5) On March 20, #1 copper cathode in east China was on parity, down 20 WoW; spot prices in south China were at a premium of 185, up 55 WoW; and spot prices in north China were at a discount of 170, down 40 WoW.

(6) LME copper fell 0.88% to $9,910/mt.

(7) Under the expectation of tariffs, the price spread between New York and LME copper reached a new high, accelerating the flow of non-US copper cathode into the US. The decline in treatment and refining charges (TC) for copper concentrates widened, with supply remaining tight. There were rumors of unplanned production cuts by smelters, as the peak maintenance period is expected in March-April. Social inventories saw three consecutive weeks of destocking. After copper prices rose, downstream consumption appeared slightly weak, while suppliers stood firm on quotes.

(8) Strategy recommendation: After LME copper tested the $10,000 level and pulled back, SHFE copper followed the correction. Short-term defensive positions for longs can be considered based on risk preference, either at the MA5 or MA20.

(Source: Zhongzhou Futures)

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
ACG’s Gediktepe Sulphide Expansion Produces First Copper and Zinc Concentrates; Full Production Targeted by End-2026
8 hours ago
ACG’s Gediktepe Sulphide Expansion Produces First Copper and Zinc Concentrates; Full Production Targeted by End-2026
Read More
ACG’s Gediktepe Sulphide Expansion Produces First Copper and Zinc Concentrates; Full Production Targeted by End-2026
ACG’s Gediktepe Sulphide Expansion Produces First Copper and Zinc Concentrates; Full Production Targeted by End-2026
ACG Metals announced on September 1 that its Gediktepe mine in Türkiye produced its first copper concentrate on August 31, marking the start of the ramp-up phase. The company will progressively increase throughput and optimise plant performance, targeting full production by the end of 2026. Gediktepe’s steady-state annual production target is 20,000–25,000 tonnes of copper equivalent. The full announcement also confirmed that the mine produced its first zinc concentrate in August 2026, although the specific date and volumes were not disclosed. SMM estimates the mine’s zinc-in-concentrate production at approximately 10,000–15,000 tonnes of contained zinc in 2026.
8 hours ago
[ SMM Analysis ] A Visual Guide to the 2026 Semi-Annual Reports of 19 Copper Smelters
8 hours ago
[ SMM Analysis ] A Visual Guide to the 2026 Semi-Annual Reports of 19 Copper Smelters
Read More
[ SMM Analysis ] A Visual Guide to the 2026 Semi-Annual Reports of 19 Copper Smelters
[ SMM Analysis ] A Visual Guide to the 2026 Semi-Annual Reports of 19 Copper Smelters
8 hours ago
MMG Places US$64 Million Equipment Order to Support Khoemacau Expansion in Botswana
10 hours ago
MMG Places US$64 Million Equipment Order to Support Khoemacau Expansion in Botswana
Read More
MMG Places US$64 Million Equipment Order to Support Khoemacau Expansion in Botswana
MMG Places US$64 Million Equipment Order to Support Khoemacau Expansion in Botswana
Epiroc has secured an approximately SEK610 million (US$64 million) order from MMG Limited and its mining contractors, China Huaye and 23MCC, for underground mining equipment to support the expansion of the Khoemacau Copper Mine in Botswana. The order includes face drilling rigs, production drilling rigs, cable-bolting rigs, loaders and underground mine trucks, together with remote-control systems, spare parts, training and on-site technical support. The equipment will support MMG’s ongoing Khoemacau expansion, which is designed to increase annual production capacity from approximately 60,000 tonnes to 130,000 tonnes of copper metal in concentrate. The project includes construction of a new 4.5 Mt/y processing plant, which will lift total milling capacity to more than 8 Mt/y, alongside development of Zone 5 North, Mango and Zeta North-East. First copper concentrate from the expansion is expected in H1 2028. Epiroc said delivery of the new underground fleet will begin in Q4 2026 and is expected to be completed by Q2 2028, broadly aligning with the expansion schedule. The ordered fleet includes Boomer face drilling rigs, Simba production drilling rigs, Cabletec cable-bolting rigs, Scooptram loaders and Minetruck underground trucks, with several units equipped for automation and remote-control operation. The equipment order represents another execution milestone for the already-approved Khoemacau expansion, rather than a new production target. With procurement progressing and equipment deliveries scheduled through Q2 2028, the project continues to advance toward MMG’s planned increase in copper-in-concentrate capacity to 130,000 tonnes per year. The expansion represents a significant planned increase in Khoemacau’s copper production capacity in Botswana’s Kalahari Copper Belt.
10 hours ago