Statistics Bureau: Resumption of Operations at Refined Smelters and New Smelter Launches Boost China's Copper Production, Up YoY in January-February

Published: Mar 20, 2025 17:52
The National Bureau of Statistics (NBS) released a report showing that China's refined copper (copper cathode) production for January-February 2025 was 2.3 million mt, up 3.7% YoY. Some smelters underwent maintenance in January but resumed normal operations in February. Most smelters had already stockpiled sufficient raw material inventory before the New Year and were not affected by low copper concentrate TCs. Additionally, a new smelter in the southwest began production, leading to an increase in copper output in February. Entering March, according to SMM, three smelters have planned maintenance, but the impact on actual production is relatively small, with some manufacturers indicating that the maintenance effects will be reflected in April. Due to tight copper scrap supply, smelters producing copper cathode from copper scrap maintained low production levels. A few companies producing electrolytic copper from ore had to reduce their production load due to significant losses.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
SHFE Approves Warehouse Capacity Adjustments for Copper, Aluminum, and Zinc Futures in Shanghai
8 mins ago
SHFE Approves Warehouse Capacity Adjustments for Copper, Aluminum, and Zinc Futures in Shanghai
Read More
SHFE Approves Warehouse Capacity Adjustments for Copper, Aluminum, and Zinc Futures in Shanghai
SHFE Approves Warehouse Capacity Adjustments for Copper, Aluminum, and Zinc Futures in Shanghai
On September 2, the Shanghai Futures Exchange (SHFE) announced that it had approved Shanghai Yuqiang Supply Chain Management Co., Ltd. to adjust its designated warehouse capacity for copper, aluminum and zinc futures. At the storage site at No. 3501 Gonghe New Road, Shanghai, the company will cancel its copper and aluminum futures storage qualifications, while its approved zinc futures warehouse capacity will remain unchanged at 20,000 tonnes. At the site at No. 2222 Jichuan Road, Minhang District, Shanghai, its zinc futures storage qualification will be canceled, while approved capacity will be adjusted to 45,000 tonnes of copper and 5,000 tonnes of aluminum.
8 mins ago
Eldorado Evaluates 43% Mill Expansion at McIlvenna Bay as Mine Nears Commercial Production
11 mins ago
Eldorado Evaluates 43% Mill Expansion at McIlvenna Bay as Mine Nears Commercial Production
Read More
Eldorado Evaluates 43% Mill Expansion at McIlvenna Bay as Mine Nears Commercial Production
Eldorado Evaluates 43% Mill Expansion at McIlvenna Bay as Mine Nears Commercial Production
Eldorado Gold is evaluating a 43% expansion of processing capacity at the McIlvenna Bay copper-zinc mine in Saskatchewan, from 4,900 tpd to about 7,000 tpd, alongside a potential silver-lead circuit. More than 400,000 tonnes of material are available for processing as the operation ramps toward commercial production in Q3 2026. The existing feasibility plan targets average life-of-mine copper production of around 41 million lb (18.6kt) per year.
11 mins ago
One and One Secures Over 2,000 Tonnes of Feedstock for New Philippine Metals Recovery Line
12 mins ago
One and One Secures Over 2,000 Tonnes of Feedstock for New Philippine Metals Recovery Line
Read More
One and One Secures Over 2,000 Tonnes of Feedstock for New Philippine Metals Recovery Line
One and One Secures Over 2,000 Tonnes of Feedstock for New Philippine Metals Recovery Line
One and One Green Technologies has secured more than 2,000 tonnes of feedstock, including copper-bearing, nickel and electronic sludge, for its new metals recovery line in the Philippines. Equipment installation is underway and production is targeted before end-2026. The facility will recover copper, nickel, gold and silver from industrial and electronic waste, adding new local processing capacity for complex secondary metal feedstocks.
12 mins ago