HAALA Energy Secures SAR 28.5 Million in Series A Funding to Drive 30 MWp C&I Solar Expansion

Published: Mar 17, 2025 10:45
Saudi Arabian solar developer and installer HAALA Energy has successfully raised SAR 28.5 million in its Series A funding round, paving the way for accelerated growth in its commercial and industrial (C&I) solar project pipeline.

Saudi Arabian solar developer and installer HAALA Energy has successfully raised SAR 28.5 million in its Series A funding round, paving the way for accelerated growth in its commercial and industrial (C&I) solar project pipeline.

Headquartered in Jeddah, the company announced that the funding round was led by Fakeeh Investment Holding, the majority shareholder of Fakeeh Care, a key player in the local healthcare sector. The investment includes SAR 18.5 million in equity financing and SAR 10 million in debt funding. With this capital injection, HAALA Energy aims to deploy 30 MWp of solar capacity for C&I clients over the next three years.

Founded in 2017, HAALA Energy specializes in solar project development, installation, and operations & maintenance. Its client portfolio features major corporations, including Savola Group, IKEA Alsulaiman, and leading pharmaceutical and healthcare firms such as GSK, Fakeeh Care Group, and Tamer Group.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
49 mins ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
49 mins ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
52 mins ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
52 mins ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
52 mins ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
52 mins ago