Green Hydrogen Project Tracking—Tender for Hydrogen Electrolyzer Production Line by Dongfang Electric Dongfang Boiler

Published: Mar 14, 2025 09:51

On March 6, Dongfang Electric Corporation Dongfang Boiler Co., Ltd. issued a tender announcement for the procurement of the Ziyang hydrogen production electrolyzer production line.

The details of the tender announcement for the procurement of the Ziyang hydrogen production electrolyzer production line by Dongfang Electric Corporation Dongfang Boiler Co., Ltd. are as follows:

I. Basic Information

  • Tendering Unit : Dongfang Electric Corporation Dongfang Boiler Co., Ltd.
  • Agency Unit : Sichuan Zhuoxin Rongda Tendering Agency Co., Ltd.
  • Project Number : ZXRD-SC-2025-1011
  • Project Budget : 10 million yuan
  • Release Date : March 6, 2025
  • Bid Opening Time : March 27, 2025, 10:30 AM

II. Project Overview and Tender Scope

  • Project Name : Procurement of the Ziyang Hydrogen Production Electrolyzer Production Line by Dongfang Electric Corporation Dongfang Boiler Co., Ltd.
  • Project Location : Building 4, Ziyang Inland Port Hydrogen Energy Park
  • Tender Content : Procurement and construction of a hydrogen production electrolyzer production line, including design, manufacturing, installation, commissioning, technical services, operation and maintenance training, and transportation.

III. Delivery Date and Requirements

  • Delivery Date : The main equipment, including nickel mesh welding line, electrolyzer turnover platform, and airtight testing equipment, must be delivered within 60 days after the contract is signed, followed by installation work.
  • Maximum Bid Price : 10 million yuan (tax included). Bids exceeding this price will be rejected.

IV. Bidder Qualification Requirements

  • Basic Requirements :

    • Possess the ability to independently assume civil liability.
    • Have good commercial reputation and sound financial accounting systems.
    • Possess the financial strength, professional technical capabilities, and comprehensive pre-sales and after-sales service guarantee systems necessary to perform the contract.
    • Have a good record of paying taxes and social security funds in accordance with the law.
    • Meet other conditions stipulated by laws and administrative regulations.
  • Special Qualification Conditions :

    • The manufacturer of the bidding product must have at least three similar effective performance cases with a contract amount not less than 2 million yuan each, including supply and installation cases of electrolyzer production lines, from January 1, 2020, to the present. Proof materials such as contract copies and on-site photos of production line cases must be provided.
  • Consortium Bidding Requirements :

    • Consortium bidding is accepted for this tender. The unit responsible for the production line design must act as the lead party of the consortium.
    • The number of consortium members (including the lead party) shall not exceed two.
    • The consortium must comply with relevant regulations and requirements for consortium bidding and submit a consortium agreement specifying the lead party and the rights and obligations of each party.
  • Other Requirements :

    • Agent bids are not accepted for this tender.
    • Bidders must not be subject to suspension or cancellation of bidding qualifications, orders to cease production or business, temporary or permanent revocation of licenses, liquidation, or bankruptcy declarations that would impair their ability to perform the contract.
    • Bidders must not have the same legal representative or shareholding/management relationships with other participants in this tender project.
    • Bidders must not have provided design, technical specifications, or other consulting services for this tender project or acted as the tendering agency.
    • Bidders must not have had major product quality issues in the past three years.
    • Bidders must not be listed as dishonest persons subject to enforcement, major tax law violators, or included in the government procurement serious violation and dishonesty record list.

V. Acquisition of Tender Documents

  • Acquisition Time : From 9:00 AM on March 7, 2025, to 5:00 PM on March 13, 2025 (Beijing Time).
  • Acquisition Method : Online acquisition. Relevant documents must be scanned and uploaded for review. After approval, the tender documents can be obtained.
  • Tender Document Fee : 500 yuan per set, non-refundable after sale.

VI. Submission of Bidding Documents

  • Submission Deadline : March 27, 2025, 10:30 AM.

VII. Contact Information

  • Contact Person : Contact information can be found in the relevant tender announcement, such as Engineer Zhang (E-mail: zchyzb20@126.com) or Engineer Hou, etc.

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
In January, national passenger car producers' new energy wholesale estimates reached 900,000 units, up 1% YoY.
21 hours ago
In January, national passenger car producers' new energy wholesale estimates reached 900,000 units, up 1% YoY.
Read More
In January, national passenger car producers' new energy wholesale estimates reached 900,000 units, up 1% YoY.
In January, national passenger car producers' new energy wholesale estimates reached 900,000 units, up 1% YoY.
According to the latest data from the Passenger Car Association, in December 2025, producers with new energy wholesale sales exceeding 10,000 units accounted for 93% of the total wholesale sales of passenger NEVs that month. Based on preliminary January data, these producers achieved sales of 830,000 units in January. As most producers have already locked in their major sales figures, by applying the structural proportion from the previous month to the current month's data, the estimated wholesale sales of passenger NEVs nationwide in January were 900,000 units. According to comprehensive preliminary monthly association data: the estimated wholesale sales of NEVs by national passenger car producers in January 2026 were 900,000 units, up 1% YoY.
21 hours ago
CAAM: In 2025, 476,000 complete vehicles were imported, down 32.4% YoY.
21 hours ago
CAAM: In 2025, 476,000 complete vehicles were imported, down 32.4% YoY.
Read More
CAAM: In 2025, 476,000 complete vehicles were imported, down 32.4% YoY.
CAAM: In 2025, 476,000 complete vehicles were imported, down 32.4% YoY.
据中国汽车工业协会整理的海关总署数据显示,2025年12月,汽车整车进口3.0万辆,环比下降30.4%,同比下降56.1%;进口金额14.7亿美元,环比下降23.6%,同比下降52.5%。2025年,汽车整车进口47.6万辆,同比下降32.4%;进口金额236.4亿美元,同比下降39.7%。
21 hours ago
Canada Announces New EV Strategy, to Collaborate with China
21 hours ago
Canada Announces New EV Strategy, to Collaborate with China
Read More
Canada Announces New EV Strategy, to Collaborate with China
Canada Announces New EV Strategy, to Collaborate with China
According to CCTV News, on February 5, Canadian Prime Minister Mark Carney announced a new electric vehicle strategy, including the reinstatement of car purchase subsidies, and stated that Canada will cooperate with China to promote the local production and export of EVs in Canada. According to a statement released by the Prime Minister's Office of Canada, the country will make full use of existing and newly established trade agreements, including a recently reached EV cooperation agreement with China, to facilitate large-scale investment in this sector, diversify Canada’s automotive export markets, and position Canada as one of the global leaders in the electric vehicle industry.
21 hours ago
Green Hydrogen Project Tracking—Tender for Hydrogen Electrolyzer Production Line by Dongfang Electric Dongfang Boiler - Shanghai Metals Market (SMM)