Global Top 10 Power and ESS Battery Shipments Announced, Six Chinese Companies Hold Nearly 70% Market Share

Published: Feb 26, 2025 08:36
[Global Top 10 Power and ESS Battery Shipments Released: Six Chinese Companies Hold Nearly 70% Market Share] In 2024, global power and ESS battery shipments reached 1,299 GWh. Among them, CATL secured the top position with shipments of 491 GWh. (Battery Network)

全球动力及储能电池出货量排名

On February 24, the South Korean research institute SNE Research released the 2024 global power and ESS battery shipment rankings.

According to the rankings, global power and ESS battery shipments in 2024 reached 1,299 GWh. Among them, CATL secured the top position with shipments of 491 GWh.

Other Chinese companies on the list include BYD, EVE, CALB, Gotion High-tech, and Sunwoda, ranking second, fourth, fifth, sixth, and tenth, respectively.

These six Chinese companies collectively accounted for 69% of the global power and ESS battery market share.

South Korean companies saw a decline in overall market share, with LGES, Samsung SDI, and SK On ranking third, seventh, and ninth, respectively, with a combined market share of approximately 16%.

For Japanese companies, Panasonic ranked eighth, with power and ESS battery shipments down 46% YoY, the largest decline among the Top 10 companies, and a market share of 3%.

SNE Research also noted that the total market share of the Top 10 global power and ESS battery companies decreased from 92% in 2023 to 87% in 2024, a drop of 5%.

In terms of power battery shipment rankings, the Top 10 global power battery companies in 2024 were CATL, BYD, LGES, CALB, Panasonic, Samsung SDI, Gotion High-tech, SK On, EVE, and Sunwoda.

For ESS battery shipment rankings, the Top 10 global ESS battery companies in 2024 were CATL, EVE, BYD, CALB, Gotion High-tech, Samsung SDI, LGES, Panasonic, Sunwoda, and SK On.

Previously, research institutions EVTank and the China Battery Industry Research Institute jointly released data on 2024 global power and ESS battery shipments: global power battery shipments reached 1,051.2 GWh in 2024, up 21.5% YoY; global ESS battery shipments reached 369.8 GWh in 2024, up 64.9% YoY.

From the competitive landscape of major global power battery enterprises, CATL ranked first in 2024 with shipments of nearly 360 GWh, holding a global market share of 34.2%, down 1.5 percentage points compared to 2023. Its top five automaker clients in 2024 were Tesla, Geely, BMW, Volkswagen, and NIO.

BYD, driven by its NEV group, ranked second in power battery shipments. Additionally, BYD's key automaker clients in 2024 included Xiaomi, Tesla, Toyota, and XPeng.

Ranking third was South Korea's LGES, with power battery shipments of nearly 120 GWh in 2024. Its top five clients were Volkswagen, Tesla, General Motors, Hyundai, and Volvo.

According to EVTank data, the companies ranking fourth to tenth in global power battery shipments in 2024 were CALB, South Korea's SK On, Japan's Panasonic, South Korea's Samsung SDI, Gotion High-tech, EVE, and SVOLT Energy Technology, respectively.

In the competitive landscape of major global ESS battery enterprises, eight of the top ten companies in 2024 were Chinese. CATL led with nearly 110 GWh of ESS battery shipments, accounting for 29.5% of the global market share, followed by EVE, Xiamen Hithium, BYD, AESC, CALB, REPT, and Gotion High-tech. South Korea's Samsung SDI and LGES ranked ninth and tenth, respectively.

全球主要储能电池企业

Comparing the rankings of the Top 10 companies in 2023 and 2024, it is evident that the competitiveness of Japanese and South Korean companies in the ESS sector has significantly declined. Among Chinese companies, EVE rose to second place globally; BYD dropped from second in 2023 to fourth in 2024; AESC showed significant progress, climbing to fifth globally, with approximately 50% of its shipments exported overseas through overseas system integrators; REPT's shipments declined, ranking seventh globally.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
22 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
22 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
22 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
22 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
22 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
22 hours ago