Beijing Issues the Notice on the "Beijing Green Energy New Technology and New Product First Application Catalog (First Batch)"

Published: Feb 25, 2025 16:07

I. Background and Purpose of the Solicitation

To promote the development of Beijing's green energy industry, plan and build a trillion-yuan green energy industrial cluster, further accelerate the industrialisation and market application of green energy technological innovations, and enhance the supply level of green technologies and products in Beijing, the Beijing Municipal Bureau of Economy and Information Technology has decided to solicit innovative products in the green energy field to form the "Beijing Green Energy New Technology and New Product First Application Catalogue (First Batch)."

  1. II. Solicitation Targets and Requirements Solicitation Targets
    • : Innovative products in the fields and directions of water electrolysis hydrogen production equipment, liquid hydrogen equipment, solid-state hydrogen storage and supply equipment, hydrogen compressors, high-temperature fuel cells, hydrogen turbines, high-efficiency lithium battery energy storage systems, sodium-ion battery energy storage systems, flow battery energy storage systems, large power flywheel energy storage systems, compressed air energy storage systems, solid-state batteries, perovskite solar cells, and other green energy equipment.
  2. Solicitation Requirements:
    • The products should be innovative products in the green energy field that have completed industrialisation development and construction but are still in the market validation or initial application stage.
    • The products should demonstrate significant breakthroughs in performance or technical parameters, possess high technological content and added value, and have independent intellectual property rights.
    • The applicant must be a green energy-related manufacturing enterprise based in Beijing, with products manufactured in Beijing, and must have stable production capacity.
    • The cumulative sales revenue of the applicant's (individual) product in 2024 should reach 500,000 yuan or more.
    • The shareholding ratio between the applicant and the user unit, whether directly or indirectly, must not exceed 30%, and they must not have the same actual controller. The user unit must not be a trading company.

  1. III. Application Process and Materials Application Process
    • : The applicant enterprise must complete the "Beijing Green Energy New Technology and New Product First Application Catalogue (First Batch) Product Solicitation Application Form" as required and submit it to the district economic and information technology authority.
    • The district economic and information technology authorities will compile a summary of eligible enterprise products and submit it to the Beijing Municipal Bureau of Economy and Information Technology.
  2. Application Materials:
    • The applicant enterprise must submit the "Beijing Green Energy New Technology and New Product First Application Catalogue (First Batch) Product Solicitation Application Form" and relevant supporting materials.
    • The district economic and information technology authorities must submit a summary of eligible enterprise products.

  1. IV. Timeline and Contact Information Timeline
    • : The district economic and information technology authorities must submit the summary of eligible enterprise products to the Beijing Municipal Bureau of Economy and Information Technology by February 26.
  2. Contact Information:
    • Hard copy materials must be stamped with the recommending unit's official seal and sent by courier to No. 3 Liuzhuang Road, Building 1, Tongzhou District, Beijing (Industrial Development Promotion Center, Materials and Green Energy Industry Promotion Department, Beijing Municipal Bureau of Economy and Information Technology).
    • Electronic materials (WORD version and stamped version) should be sent simultaneously to the Materials Department's email address (lijinglong@jxj.beijing.gov.cn).

  1. V. Other Matters
  2. The "Beijing Green Energy New Technology and New Product First Application Catalogue" serves as an important basis for Beijing's reward policies for the first application of new green energy technologies and products.

District economic and information technology authorities are requested to attach great importance to the solicitation of catalogue products, actively mobilise local enterprises to apply, and ensure proper recommendations.

In summary, this notice aims to promote the innovative development of Beijing's green energy industry by soliciting new technologies and products for inclusion in the first application catalogue, thereby accelerating the industrialisation and market application of green energy technological innovations.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
3 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
3 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
3 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
3 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
3 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
3 hours ago