[SMM Announcement] Notice on the Launch of Price Points for Artificial Graphite Anodes Used in NEV, ESS, and Consumer Electronics and the Discontinuation of Existing Artificial Graphite Price Points

Published: Feb 05, 2025 15:34 (GMT+8)
Source: SMM
With the rapid development of the lithium battery anode industry, enterprises are paying increasing attention to the prices of anodes used in specific segments such as power, ESS, and consumer sectors.

Dear Users,

Greetings!

With the rapid development of the lithium battery anode industry, enterprises are paying increasing attention to the prices of anodes used in specific segments such as power, ESS, and consumer sectors. To meet market demand, provide more comprehensive and diverse spot price information, and offer enterprises more settlement reference standards, SMM, after market surveys and communication, has launched our optimized artificial graphite price points on September 3, 2024, including low-end artificial graphite for NEV, mid-end artificial graphite for NEV, high-end artificial graphite for NEV, low-end artificial graphite for ESS, mid-end artificial graphite for ESS, high-end artificial graphite for ESS, low-end artificial graphite for consumer electronics, mid-end artificial graphite for consumer electronics, and high-end artificial graphite for consumer electronics. Additionally, SMM has decided to discontinue the existing price points for low-end, mid-end, and high-end artificial graphite starting November 29, 2024.

Introduction to the New SMM Artificial Graphite Price Points:

SMM artificial graphite price points are categorized into three types: artificial graphite for NEV, artificial graphite for ESS, and artificial graphite for consumer electronics.

SMM has comprehensively considered the characteristics of end-user requirements on cycle life, driving range, and charging time in different application scenarios. Based on the selection criteria of anode materials by battery manufacturers, SMM has evaluated the requirements for battery energy density, battery cycle times, and charge rate performance. The price points are defined by three key indicators: specific capacity, cycle life, and charge rate. The specifications are as follows:

Artificial Graphite for NEV:
- Low-end artificial graphite for NEV: Specific capacity 340-349mAh/g, charge rate 0-1.5C.
- Mid-end artificial graphite for NEV: Specific capacity 349-355mAh/g, charge rate 1.5-2.5C.
- High-end artificial graphite for NEV: Specific capacity ≥355mAh/g, charge rate ≥2.5C.

Artificial Graphite for ESS:
- Low-end artificial graphite for ESS: Specific capacity 340-345mAh/g, cycle life ≥2,000 times.
- Mid-end artificial graphite for ESS: Specific capacity ≥345mAh/g, cycle life ≥4,000 times.
- High-end artificial graphite for ESS: Specific capacity ≥350mAh/g, cycle life ≥8,000 times.

Artificial Graphite for Consumer Electronics:
- Low-end artificial graphite for consumer electronics: Specific capacity ≥340mAh/g, charge rate 0-1.5C.
- Mid-end artificial graphite for consumer electronics: Specific capacity ≥345mAh/g, charge rate ≥1.5C.
- High-end artificial graphite for consumer electronics: Specific capacity ≥350mAh/g, charge rate ≥3C.

This pricing system is more applicable to the NEV, ESS, and consumer sectors, aiming to provide the market with more comprehensive and diverse spot price information and offer enterprises more settlement reference standards.

We welcome more enterprises in the industry chain to participate and support SMM in better serving companies related to the new energy industry chain. If you have any questions, please contact Disheng Feng at 021-51666714 or fengdisheng@smm.cn.

Shanghai Metals Market

New Energy Research Team

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM News] Solis starts lithium drilling at Campo Grande
Sep 25, 2026 15:16 (GMT+8)
[SMM News] Solis starts lithium drilling at Campo Grande
Read More
[SMM News] Solis starts lithium drilling at Campo Grande
[SMM News] Solis starts lithium drilling at Campo Grande
Solis Minerals has started diamond drilling at its Campo Grande Lithium Project in Brazil's Araçuaí-Salinas Lithium Valley. The company plans five holes totalling about 1,000 m, with planned depths of up to 200 m, to test lithium pegmatites across a 500 m corridor. The targets rest on coincident multi-element geochemical anomalies at surface and on historical auger drilling results. Historical work by Rio Tinto and later mapping and geochemical work by Solis defined the targets. Solis has also mapped a new pegmatite swarm of three coherent outcrop zones between planned holes DHCG-001 and DHCG-004. The program will test the continuity, geometry and lithium potential of the pegmatites beneath surface, starting where mapped pegmatites coincide with geochemical anomalies. Solis says Campo Grande's geology and geochemistry are comparable to PLS Group's Colina Lithium Project, about 100 km to the southwest. Separately, Solis has completed seven drill holes at its Mandacaru Lithium Project in Brazil, with assay results pending.
Sep 25, 2026 15:16 (GMT+8)
[SMM News] Charger re-commences drilling at Medcalf lithium deposit
Sep 25, 2026 15:15 (GMT+8)
[SMM News] Charger re-commences drilling at Medcalf lithium deposit
Read More
[SMM News] Charger re-commences drilling at Medcalf lithium deposit
[SMM News] Charger re-commences drilling at Medcalf lithium deposit
Charger Metals has mobilized a second drill rig to its Lake Johnston Lithium Project in Western Australia as part of a 10,000 m program targeting resource growth. Diamond and reverse circulation rigs are now operating at the Medcalf lithium deposit, and RC drilling began just over a week ago. The program will double the meters drilled at Medcalf. The drilling targets extensions and infill at the Medcalf inferred mineral resource estimate of 10.6 Mt grading 1% Li₂O. Drilling has further defined the Medcalf West Exploration Target of 3-5 Mt at 1-1.4% Li₂O. The program also aims to provide diamond core for metallurgical and geotechnical test work. Following the recent Medcalf resource upgrade, which raised contained Li₂O by 34%, Charger's board has committed to a Scoping Study on the Lake Johnston Project. The current resource sits on a predominantly 40 m x 80 m drilling grid, including 10,936 m of drilling at a cost of $32 per tone of contained Li₂O. The program is fully funded from Charger's sale of the Bynoe Lithium Project to Core Lithium for $3.75 million cash, received on 17 July 2026. Lake Johnston lies 450 km east of Perth in the Yilgarn Province, about 70 km from the Earl Grey Lithium Project, where Covalent Lithium began mining and commissioning in March 2024.
Sep 25, 2026 15:15 (GMT+8)
[SMM News] Savannah raised over $40 million to develop the Portuguese lithium project
Sep 25, 2026 15:14 (GMT+8)
[SMM News] Savannah raised over $40 million to develop the Portuguese lithium project
Read More
[SMM News] Savannah raised over $40 million to develop the Portuguese lithium project
[SMM News] Savannah raised over $40 million to develop the Portuguese lithium project
On September 23(rd), Savannah Resources raised US$30 million for its Barroso Lithium Project in Portugal, via 408 million shares at £0.055/share, including US$11.2 million from subscription agreements with major shareholders. Combined with US$15.5 million cash on hand, funds go toward long lead item fabrication, access road works, EPCM contracting, plant engineering, permitting, and land use rights. Barroso's July 2026 phase one DFS outlined a 14-year mine life at 183,000 t/y lithium oxide, 5.5% grade, based on US$1,788/t pricing yielding US$3.2 billion EBITDA, US$1.9 billion free cash flow, and US$913 million post-tax NPV. The deposit holds 39 million tones at 1.05% Li2O for 411,900 tones contained, Europe's largest hard-rock spodumene resource. The funding advances one of the few large-scale hard-rock lithium sources under development outside China linked African and South American supply chains, feeding EU critical raw material diversification targets.
Sep 25, 2026 15:14 (GMT+8)
[SMM Announcement] Notice on the Launch of Price Points for Artificial Graphite Anodes Used in NEV, ESS, and Consumer Electronics and the Discontinuation of Existing Artificial Graphite Price Points - Shanghai Metals Market (SMM)