[SMM Analysis] Review of Last Week's Spot Lithium Carbonate Price Trends

Published: Jan 6, 2025 09:49
Source: SMM
Last week, the center of spot lithium carbonate transaction prices moved downward.

Last week, the center of spot lithium carbonate transaction prices moved downward. The weekly average price of battery-grade lithium carbonate was 75,100 yuan/mt, and that of industrial-grade lithium carbonate was 71,800 yuan/mt, with a decline of around 500 yuan/mt WoW.

From the current market transaction situation, as last week coincided with the year-end period, some enterprises were involved in year-end financial reporting, leading to weaker purchasing sentiment. Moreover, in January 2025, there are signs of a simultaneous decline in supply and demand for lithium carbonate. Some upstream lithium chemical plants have maintenance schedules, and under the pessimistic impact of weakened downstream demand, lithium carbonate production in January is expected to decrease by 9% MoM. Downstream material plants have gradually completed pre-Chinese New Year inventory stocking, coupled with a decline in January production schedules, further weakening purchasing sentiment. Considering the subsequent simultaneous decline in lithium carbonate supply and demand, along with the circulating inventory levels, spot lithium carbonate prices are expected to exhibit sideways movement.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
15 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
15 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
15 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
15 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
15 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
15 hours ago
[SMM Analysis] Review of Last Week's Spot Lithium Carbonate Price Trends - Shanghai Metals Market (SMM)