China proposes export ban on battery cathode and lithium processing technology — here are the specifics

Published: Jan 3, 2025 17:49
Source: SMM
On January 2, 2025, China’s Ministry of Commerce issued a file titled “Notice on Adjustments to the Public Consultation for the Catalogue of Technologies Prohibited or Restricted from Exporting from China.” The notice mentions the potential implementation of export restrictions on battery and lithium processing related technologies. The deadline for feedback submission is February 1, 2025.

On January 2, 2025, China’s Ministry of Commerce issued a file titled “Notice on Adjustments to the Public Consultation for the Catalogue of Technologies Prohibited or Restricted from Exporting from China.” The notice mentions the potential implementation of export restrictions on battery and lithium processing related technologies. The deadline for feedback submission is February 1, 2025.

The specifics of the proposed technologies are as follows:

Section (II) Chemical Raw Materials and Chemical Product Manufacturing Industry

Battery Cathode Material Preparation Technologies - Key Control Points:

1. Lithium Iron Phosphate (LFP) battery material preparation technology meeting the following criteria:

Chemical Formula: LixFeyMzPO4 where x,y,z ≥ 0 and M represents one or multiple elements excluding lithium (Li) and iron (Fe).

Material Characteristics:

Powder compact density ≥ 2.58 g/cm³ under 300 MPa.

Reversible capacity ≥ 160 mAh/g at 0.1C.

Initial Coulombic efficiency ≥ 97%.

2. Lithium Manganese Iron Phosphate (LMFP) battery material preparation technology meeting the following criteria:

Chemical Formula: LixFeyMnzMaPO4, where x,y,z,a≥0 represents one or multiple elements excluding lithium (Li), iron (Fe), and manganese (Mn).

Material Characteristics:

Powder compact density ≥ 2.38 g/cm³ under 300 MPa.

Initial Coulombic efficiency ≥ 90%.

Reversible capacity ≥ 155 mAh/g at 0.1C, with an average operating voltage ≥ 3.85 V.

Capacity retention rates: ≥ 97% at 1C discharge and ≥ 95% at 2C discharge.

3. Phosphate-Based Cathode Precursor Preparation Technology
Includes the production of iron phosphate, manganese iron phosphate, battery-grade ferrous oxalate, and battery-grade lithium phosphate dihydrogen. Iron phosphate must meet the following:

Tap density > 2.1 g/cm³.

Magnetic impurities < 10 ppb.


Section (III) Non-Ferrous Metal Smelting and Rolling Industry


1. Modification to Non-Ferrous Metallurgical Technology



Updated to include the extraction of gallium from alumina mother liquor using methods such as ion exchange techniques.


2. New Additions to Non-Ferrous Metallurgical Technology

Spodumene-Based Lithium Extraction for Lithium Carbonate Production:

Techniques for producing lithium carbonate from purified lithium solutions.

Thermal decomposition and carbonization refinement.

Mother liquor recycling technology.

Automated continuous production control systems.

Lithium hydroxide carbonization process.

Spodumene-Based Lithium Extraction for Lithium Hydroxide Production:

Techniques for producing lithium hydroxide from purified lithium solutions.

Sodium separation via cryogenic crystallization.

Evaporation crystallization technology.

Automated continuous production control systems.

Pulverizing and drying technology.

Metallic Lithium and Lithium Alloy Preparation Technology:

Multi-anode electrolysis technology.

Distillation and purification processes for metallic lithium.

Rolling and processing technology for metallic lithium and lithium alloys.

Direct Lithium Extraction from Brines:

Synthesis of adsorbent materials (aluminum-based, titanium-based, manganese-based).

Integration of adsorption and membrane systems using PID-controlled processes.

Preparation of Purified Lithium Solutions:

Impurity removal using ion exchange techniques.

Removal of impurities like boron, calcium, potassium, sodium, and sulfur.

Membrane separation and electrodialysis for impurity removal.


Author: Hongqiu Su | Battery Metals Analyst Associate | London Office, Shanghai Metals Market


Email: lilysu@smm.cn

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
De Nora and Tuleva sign a binding agreement to realize one of the largest US electrochemical lithium hydroxide plants
Feb 16, 2026 15:46
De Nora and Tuleva sign a binding agreement to realize one of the largest US electrochemical lithium hydroxide plants
Read More
De Nora and Tuleva sign a binding agreement to realize one of the largest US electrochemical lithium hydroxide plants
De Nora and Tuleva sign a binding agreement to realize one of the largest US electrochemical lithium hydroxide plants
Italian electrochemistry and sustainable technology company Industrie De Nora S.p.A., through its subsidiary De Nora Permelec Ltd., has signed a binding Memorandum of Understanding with U.S. clean-energy materials company Tuleva Inc. to supply a high-capacity electrolysis system for Tuleva’s planned lithium hydroxide monohydrate refining project in the United States. Under the agreement, De Nora will deliver two ion-exchange membrane bipolar electrolysis systems (CECHLO 2C 843L), supporting an annual production capacity of approximately 11,000 tonnes of battery-grade lithium hydroxide monohydrate. The system contract is valued at over €10 million, and delivery is expected to be completed within 15 months after the final agreement is executed.
Feb 16, 2026 15:46
Baota Mountain Converter Station's AC System Energized, Marking Key Milestone in UHV Project
Feb 14, 2026 20:23
Baota Mountain Converter Station's AC System Energized, Marking Key Milestone in UHV Project
Read More
Baota Mountain Converter Station's AC System Energized, Marking Key Milestone in UHV Project
Baota Mountain Converter Station's AC System Energized, Marking Key Milestone in UHV Project
On February 5, the AC system of the Baota Mountain Converter Station, the sending - end station of the ±800 kV North Shaanxi - Anhui UHV DC power transmission project, was successfully energized for the first time. This marks that the AC system of the converter station has entered the startup commissioning stage, and the entire AC system of the project is expected to be put into operation before the Spring Festival. It is reported that the rated voltage of the North Shaanxi - Anhui UHV project is ±800 kV, with a rated capacity of 8 million kilowatts, and a dynamic investment of 20.5 billion yuan. The project starts from the Baota Mountain Converter Station in Yan'an City, Shaanxi Province, and ends at the Hezhou Converter Station in Hefei City, Anhui Province. It passes through three provi
Feb 14, 2026 20:23
World's First Multi-Source DC Project in Jiangsu Completes Phase II, Boosts Cross-River Power Transmission
Feb 14, 2026 20:21
World's First Multi-Source DC Project in Jiangsu Completes Phase II, Boosts Cross-River Power Transmission
Read More
World's First Multi-Source DC Project in Jiangsu Completes Phase II, Boosts Cross-River Power Transmission
World's First Multi-Source DC Project in Jiangsu Completes Phase II, Boosts Cross-River Power Transmission
On February 12, the second - phase project of the ±200 kV DC power transmission project from Yangzhou to Zhenjiang in Jiangsu, which is the world's first multi - source commutated DC power transmission project and China's first AC - DC hybrid cross - river project, was completed and put into operation. The project's transmission line is about 228 kilometers long, with a transmission capacity of 1.2 million kilowatts. It passes through three cities (Huai'an, Yangzhou, and Zhenjiang) and seven counties. Among them, a 47 - kilometer new - built DC transmission line is erected on the same tower as the 500 kV AC line, and two new converter stations are built. Without adding a new cross - Yangtze - River power transmission channel, the original cross - river power transmission capacity has been
Feb 14, 2026 20:21