3.585 yuan/W! Henan Tongbai 300MW Fishery-Solar Hybrid EPC Bid Candidates Announced

Published: Dec 30, 2024 13:29 (GMT+8)
[3.585 yuan/W! Winning Bidder Announced for 300MW Fishery-PV Complementary EPC Project in Tongbai, Henan] On December 28, the winning bidder for the 300-megawatt fishery-PV complementary power generation project EPC in Tongbai County, Henan, was announced. China Railway 15th Bureau Group Fourth Engineering Co., Ltd. is the sole winning bidder, with a bid price of 1.0756 billion yuan and a unit price of 3.585 yuan/W. (Polaris Solar PV Network)

On December 28, the winning candidate for the EPC (Engineering, Procurement, and Construction) contract of the 300-megawatt (MW) fishery-PV complementary power generation project in Tongbai County, Henan Province, was announced. China Railway 15th Bureau Group Fourth Engineering Co., Ltd. is the sole winning candidate, with a bid price of 1.0756 billion yuan and a unit price of 3.585 yuan/W.

According to the bidding announcement, the project is located within Tongbai County, Henan Province. The bidding scope includes but is not limited to design (including the design of the distributed PV power generation project and its supporting 220KV booster station and 220KV transmission line scheme, preliminary design, budget and revised budget, construction drawing design, follow-up design services, on-site guidance and services during construction, project completion acceptance, and review of as-built drawings, etc.), material procurement, construction, completion (handover) acceptance, assisting the owner in handling relevant procedures, trial operation, transfer of specialized works and facilities, maintenance before handover, project documentation, and warranty work during the defect liability period (warranty period).

The project is expected to have a construction period of 365 calendar days.

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM PV Flash] Indian PV Component Maker Vishakha Renewables Files for IPO to Raise INR 12.5 Billion
7 hours ago
[SMM PV Flash] Indian PV Component Maker Vishakha Renewables Files for IPO to Raise INR 12.5 Billion
Read More
[SMM PV Flash] Indian PV Component Maker Vishakha Renewables Files for IPO to Raise INR 12.5 Billion
[SMM PV Flash] Indian PV Component Maker Vishakha Renewables Files for IPO to Raise INR 12.5 Billion
Indian solar PV component manufacturer Vishakha Renewables has submitted draft papers to the Securities and Exchange Board of India (SEBI) for an Initial Public Offering (IPO), aiming to raise INR 12.5 billion (approx. $149 million) through a fresh issue of shares. The net proceeds will primarily be used for debt repayment and expanding production lines for solar components, including solar glass and encapsulants. This move reflects how India's domestic PV supply chain is accelerating capital market access to scale alongside growing domestic module manufacturing capacity.
7 hours ago
[SMM PV Flash] US Energy Permitting Reform Bill Sparks Mixed Reactions from Clean Energy Sector
7 hours ago
[SMM PV Flash] US Energy Permitting Reform Bill Sparks Mixed Reactions from Clean Energy Sector
Read More
[SMM PV Flash] US Energy Permitting Reform Bill Sparks Mixed Reactions from Clean Energy Sector
[SMM PV Flash] US Energy Permitting Reform Bill Sparks Mixed Reactions from Clean Energy Sector
A bipartisan bill aimed at expediting the permitting process for energy projects was recently introduced in the US Senate. The bill proposes to accelerate authorization and environmental reviews for energy projects and transmission lines. While this initiative is expected to significantly ease backlogs in interconnection queues, certain compromise provisions have raised concerns across the clean energy sector. The final implementation of this reform will directly impact the deployment pace of mid-to-long-term solar PV and energy storage systems across the US.
7 hours ago
[SMM PV Flash] South Korea to Overhaul National Power Grid, Aiming to Integrate Over 100GW of Renewables
7 hours ago
[SMM PV Flash] South Korea to Overhaul National Power Grid, Aiming to Integrate Over 100GW of Renewables
Read More
[SMM PV Flash] South Korea to Overhaul National Power Grid, Aiming to Integrate Over 100GW of Renewables
[SMM PV Flash] South Korea to Overhaul National Power Grid, Aiming to Integrate Over 100GW of Renewables
The South Korean government recently announced a national grid overhaul plan, aiming to replace rigid grid connection caps with battery energy storage integration and competitive allocation of connection rights. This comprehensive infrastructure upgrade is designed to clear hurdles for integrating over 100GW of renewable energy capacity by 2030. The measure will effectively alleviate regional transmission bottlenecks and provide foundational support for the large-scale deployment of mid-to-long-term PV projects in South Korea.
7 hours ago