[SMM Analysis] The US Department of Energy (DOE) recently released its Energy Storage Strategy and Roadmap, aiming to promote the development, commercialization, and utilization of next-generation energy storage technologies.

Published: Dec 28, 2024 22:28
[SMM Analysis: The US Department of Energy (DOE) recently released its Energy Storage Strategy and Roadmap, aiming to advance the development, commercialization, and deployment of next-generation energy storage technologies.] The US Department of Energy (DOE) recently released its Energy Storage Strategy and Roadmap, aiming to advance the development, commercialization, and deployment of next-generation energy storage technologies.

The US Department of Energy (DOE) recently released its Energy Storage Strategy and Roadmap, aiming to promote the development, commercialization, and utilization of next-generation energy storage technologies. The DOE's Loan Programs Office (LPO) has announced over $70 billion in conditional commitments and closed loans to support innovative energy and clean energy supply chain technology projects, as well as reinvestment in existing energy infrastructure.

Despite some concerning signs, the DOE's current Energy Storage Grand Challenge roadmap aims to accelerate the development, commercialization, and utilization of next-generation energy storage technologies. Reports indicate that energy storage will continue to receive political support, particularly as many investments in battery manufacturing are located in traditional Republican states.

Earlier this month, the DOE's LPO completed $56.02 billion in conditional commitments and closed loans. Subsequently, it announced conditional commitments to a thermal energy startup and utility companies in California, Wisconsin, and Puerto Rico, totaling over $73 billion.

The DOE's 2024 Strategic Roadmap (SRM), building on the 2020 Energy Storage Grand Challenge roadmap, outlines strategic, beneficial, and timely storage deployment actions. The SRM emphasizes that the motivation for investing in energy storage is to ensure that "the American people have the resources they need when they need them."

The DOE will guide its storage activities through three strategic objectives:

1. Facilitate the safe and reliable deployment of energy storage technologies and accelerate the development of new technologies to meet current and future consumer needs.
2. Enhance decision-makers' ability to make informed decisions regarding energy storage investments, policies, and goals by providing unbiased, fact-based information and analysis.
3. Leverage the DOE's leadership in the global energy storage community to accelerate the pathway from innovation to commercialization through effective and enduring engagement in an innovation ecosystem, benefiting all Americans.

The SRM also proposes eight strategies to support these objectives:

1. Make long-term investments in foundational and responsible energy storage technology research.
2. Strategically target high-impact use cases for energy storage technologies.
3. Improve cost assessments for energy storage implementation.
4. Clarify value propositions by developing valuation assessments and compensation mechanisms.
5. Enhance the safety and reliability of energy storage technologies.
6. Improve equitable access to energy storage technologies to meet the needs of existing and emerging communities.
7. Strengthen and achieve a reliable, resilient, economical, diverse, sustainable, and secure domestic energy storage supply chain, including critical minerals and materials as well as circular economy practices, contributing to the expansion of US manufacturing and employment.
8. Collaborate within DOE programs, mission areas, and externally to the DOE.

These strategies are part of what the DOE refers to as the "Energy Storage Ecosystem." The provided charts illustrate this "ecosystem."

Although the future of the DOE's LPO remains uncertain, the SRM indicates that the department is heavily focused on energy storage research and innovation, providing factual information about technologies that could influence its future in the energy market.

 


 

 

 

 

 

 

 

 

  

                                                

 

 

SMM New Energy Research Team

Cong Wang 021-51666838

Linying Zhang 021-51666775

Xiaodan Yu 021-20707870

Rui Ma 021-51595780

Yue Yang 021-51666856

Ying Xu 021-51666707

Disheng Feng 021-51666714

Yujun Liu 021-20707895

Yanlin Lü 021-20707875

Xianjue Sun 021-51666757

Ye Yuan 021-51595792

Chensi Lin 021-51666836

Zhicheng Zhou 021-51666711

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
15 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
15 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
15 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
15 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
15 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
15 hours ago