BHP: Copper Ore Exploration and Development Becoming Increasingly Challenging

Published: Dec 25, 2024 15:21 (GMT+8)
【BHP: Copper Mine Exploration and Development Becoming Increasingly Challenging】According to a report by Mining.com, the exploration and development of copper deposits have become increasingly difficult amid the evolving global copper mining landscape. As copper mines are being discovered at greater depths, the costs of extracting these resources are rising, and the technical challenges are growing, ultimately driving up copper prices. A chart jointly prepared by Visual Capitalist - Elements and BHP illustrates the depth and scale of major copper mines discovered since 1900.

According to a report by Mining.com, the evolution of the global copper mining landscape has made the exploration and development of deposits increasingly challenging.

As copper ore is being discovered at greater depths, the costs of extracting these resources have risen, and the technical difficulties have increased, ultimately driving up copper prices.

A chart jointly compiled by Visual Capitalist - Elements and BHP illustrates the depth and scale of major copper ore discoveries since 1900.

A Century of Copper Ore Discoveries

Based on data from Australian mining consultancy MinEx Consulting and BHP up to 2022, the chart highlights copper ore discoveries exceeding 3 million mt of copper equivalent.

The most recent major discovery was the Filo de Sol in Argentina in 2020, located 600 meters below the surface, with copper equivalent resources just over 11 million mt.

The Andina copper mine discovered in Chile in 1955, with a copper equivalent of 144 million mt, remains the largest discovery since 1900. However, near-surface discoveries of this scale have become increasingly rare.

The Escondida copper mine, discovered in 1981, was buried at a depth of only 40 meters, in stark contrast to later discoveries of deeper deposits, such as the Resolution copper mine discovered in 2002 at a depth of 1,280 meters.

The Future of Copper Mining

Recent trends in copper ore discoveries underscore that copper mines are becoming more difficult to develop than ever before.

BHP believes that while copper recycling will play an important role in meeting growing demand, it is not enough to bridge the gap. The focus remains on improving productivity through technological advancements to increase the supply of primary copper.

BHP estimates that addressing these challenges will require an investment of $250 billion over the next decade.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
4 hours ago
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
Read More
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 have broken ground on a fourth grinding line at the Sierra Gorda copper-molybdenum mine in Chile's Atacama region. The US$725 million expansion runs for three years from January 2027, with completion by late 2029 and full output in H2 2030. Ore processing capacity rises 26%, from 131,000 tonnes per day to 165,000 tpd. Annual copper output is projected to climb from 165,000 tonnes in 2025 to 195,000 tonnes, with 6,000 tonnes of molybdenum, 58,000 ounces of gold and 1.7 million ounces of silver as by-products. The project creates over 900 direct jobs and is funded from operating cash flow and debt. Unit operating costs are expected to fall about 10%.
4 hours ago
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
5 hours ago
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Read More
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Resources has provided an update on the Preliminary Feasibility Study (PFS) for its Iberian Belt West polymetallic project in Spain, saying the study is well advanced but remains under final technical review.​ The company said the review process has been expanded to include additional technical and quality-assurance oversight before publication. As a result, Emerita now expects the PFS to be released in the coming weeks rather than within the previously indicated timeframe.​ Iberian Belt West hosts copper, zinc, lead, gold and silver mineralization and is one of Emerita’s principal development-stage assets in Spain. The PFS is expected to provide updated detail on the proposed mine plan, processing configuration, capital requirements, operating costs and project economics.​ Emerita said the additional review work is intended to ensure consistency and completeness across the technical disciplines contributing to the study before it is finalized.​ The company did not announce a revised specific publication date, and no new production, capital or economic figures were disclosed in the latest update.​ The extended review delays the next major technical milestone for Iberian Belt West, but the company continues to indicate that the PFS is nearing completion. For the copper market, the significance of the study will depend on the production profile and project economics ultimately disclosed, particularly the contribution of copper relative to the project’s other payable metals. Attention will therefore remain on the timing of the PFS release and whether the final study materially changes the project’s development outlook.
5 hours ago
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
5 hours ago
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Read More
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Minerals has reported additional drill results from its 2026 exploration programme at the Carmacks copper-gold project in Yukon, Canada, with new step-out drilling extending mineralization at Zone 2000S beyond the boundaries of the existing Mineral Resource.​ Drill hole CD-26-058 returned 75.55 metres grading 1.19% copper, 0.97 g/t gold, 10.4 g/t silver and 335 ppm molybdenum, equivalent to 2.18% copper-equivalent. The interval included 48.66 metres grading 1.61% copper, 1.39 g/t gold, 15.1 g/t silver and 475 ppm molybdenum, equivalent to 3.03% CuEq.​ Within the same hole, a higher-grade interval of 14.50 metres returned 2.30% copper, 2.68 g/t gold, 29.5 g/t silver and 1,015 ppm molybdenum, equivalent to 5.08% CuEq.​ A second hole, CD-26-059, intersected 93.99 metres grading 0.96% copper, 0.70 g/t gold, 4.6 g/t silver and 919 ppm molybdenum, equivalent to 1.94% CuEq. This included 63.97 metres at 1.26% copper, 0.96 g/t gold, 6.3 g/t silver and 1,049 ppm molybdenum, equivalent to 2.52% CuEq.​ Cascadia said the latest results continue to expand mineralization at Zone 2000S beyond the limits of the current Mineral Resource and highlight the higher-grade nature of the extension. The reported drill intervals represent drilled thicknesses, with true widths estimated at approximately 60–70%.​ The latest step-out results indicate that copper-gold mineralization at Zone 2000S extends beyond the boundaries of the current Carmacks Mineral Resource. The broad intervals and higher-grade internal zones could support future resource expansion if additional drilling confirms continuity. However, the new intersections have not yet been incorporated into an updated Mineral Resource Estimate, meaning their ultimate impact on project scale and mine planning remains to be determined.
5 hours ago