0.62 yuan PV module won the bid!

Published: Dec 23, 2024 13:25
[PV Modules Won the Bid at 0.62 Yuan!] On December 20, the winning bid result for the PV module procurement of the 600,000 kW PV project in Bohu County, a supporting project of the National Energy Bayingolin Pumped Storage Project by Xinjiang Electric Power Bayingolin Power Generation Company, was announced. The winning bidder for Section 1 is Shanghai Electric Group Hengxi PV Technology (Nantong) Co., Ltd., with a winning bid price of 0.625 yuan/W. The candidate for Section 2 is Hoshine Silicon Industry Co., Ltd., with a winning bid price of 0.629 yuan/W. (Polaris Solar PV Network)

On December 20, the winning bid result for the PV module procurement of the 600,000 kW PV project in Bohu County, supporting the Guoneng Bayingolin Pumped Storage Project by Xinjiang Electric Power Bayingolin Power Generation Company, was announced.

The winning bidder for Section 1 is Shanghai Electric Group Hengxi PV Technology (Nantong) Co., Ltd., with a winning bid price of 0.625 yuan/W, while the candidate for Section 2 is Hoshine Silicon Industry Co., Ltd., with a winning bid price of 0.629 yuan/W.

It is reported that the site of the 600,000 kW PV project in Bohu County, supporting the Guoneng Bayingolin Pumped Storage Project, is located in the southern part of Bosten Lake in Bayingolin Mongolian Autonomous Prefecture, approximately 26 km from Bosten Lake. The project land is classified as other grassland, with terrain mainly consisting of flat land and gentle slopes, sloping from south to north. The project is expected to have an AC capacity of 600 MW and a DC side capacity of 600 MWp.

Scope of bidding and section (package) division: The PV module equipment procurement project for the 600,000 kW PV project in Bohu County, supporting the Guoneng Bayingolin Pumped Storage Project, includes two sections. Section 1 requires a supply capacity of no less than 350 MWp, with at least 573,771 pieces of N-type 610Wp modules. Section 2 requires a supply capacity of no less than 250 MWp, with at least 409,837 pieces of N-type 610Wp or higher single-sided silicon bifacial double-glass PV modules, as well as the supply of matching module string connectors, spare parts, and special tools. The scope also includes factory testing, packaging, insurance, transportation to the destination, delivery, training, installation guidance, functionality realization, assistance in project plan optimization, on-site commissioning and testing, participation in trial operation, final acceptance, and responsibility for quality warranty work, as detailed in Chapter 5 of the supply requirements.

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
China Approves 17.44 GW Power Plan for Qaidam Desert Base, Including Solar, Wind, and Energy Storage Projects
3 hours ago
China Approves 17.44 GW Power Plan for Qaidam Desert Base, Including Solar, Wind, and Energy Storage Projects
Read More
China Approves 17.44 GW Power Plan for Qaidam Desert Base, Including Solar, Wind, and Energy Storage Projects
China Approves 17.44 GW Power Plan for Qaidam Desert Base, Including Solar, Wind, and Energy Storage Projects
It is understood that the National Energy Administration has officially approved the power source allocation plan for the "Qaidam Desert Base (East Golmud) Base". The planned construction scale of the power source projects at this base is 17.44 million kilowatts, including 10 million kilowatts of photovoltaic power, 5 million kilowatts of wind power, 2.64 million kilowatts of coal-fired power, 0.1 million kilowatts of solar thermal power, and 1.5 million kilowatts (for 4 hours) of electrochemical energy storage. The total investment in the projects is about 86 billion yuan. The new energy will be transmitted to Guangxi through the "Qinghai-Guangxi DC" UHV power transmission project. Currently, significant progress has been made in the preliminary work of the "Qinghai-Guangxi DC" project, w
3 hours ago
[SMM PV News] Armenia Hits 1.1 GW Solar Capacity,
Feb 6, 2026 09:17
[SMM PV News] Armenia Hits 1.1 GW Solar Capacity,
Read More
[SMM PV News] Armenia Hits 1.1 GW Solar Capacity,
[SMM PV News] Armenia Hits 1.1 GW Solar Capacity,
Armenia’s cumulative solar capacity has surged to 1.1 GW following the addition of approximately 615 MW in 2025. This rapid expansion has pushed solar's share of electricity generation to around 15%, effectively meeting the country's 2030 target years ahead of schedule. The growth is heavily driven by a net-metering scheme supporting over 50,000 autonomous producers (totaling 650 MW), though the government ended loan subsidies for rooftop solar in July to shift focus toward battery storage.
Feb 6, 2026 09:17
Spot Market and Domestic Inventory Brief Review (February 5, 2026) [SMM Silver Market Weekly Review]
Feb 5, 2026 17:36
Spot Market and Domestic Inventory Brief Review (February 5, 2026) [SMM Silver Market Weekly Review]
Read More
Spot Market and Domestic Inventory Brief Review (February 5, 2026) [SMM Silver Market Weekly Review]
Spot Market and Domestic Inventory Brief Review (February 5, 2026) [SMM Silver Market Weekly Review]
Feb 5, 2026 17:36