2024 South America Lithium Resources Field Trip - Ninth Stop: CleanTech Lithium

Published: Dec 17, 2024 09:31
Source: SMM
In recent years, the dramatic fluctuations in lithium prices have made the industry chain experience the "bittersweet" of the market.

In recent years, the dramatic fluctuations in lithium prices have made the industry chain experience the "bittersweet" of the market. Although current lithium prices are far from their past highs, the prospects of the new energy industry chain remain bright under the global advocacy for a low-carbon economy, and the importance of lithium resources is becoming increasingly prominent.

As one of the regions with the richest lithium resources globally, South America, especially the "Lithium Triangle" (Bolivia, Argentina, Chile), holds over 55% of the world's proven lithium resources. Therefore, South America's lithium resources play a crucial role in the global energy transition.

Against this backdrop, SMM organized the 2024 South America Lithium Resources Field Trip. Led by SMM Customer Manager Siyu Chen, the delegation visited lithium-related enterprises in South America from November 26 to December 7, 2024, toured local lithium mines and material companies, and held discussions with company executives to explore potential opportunities in lithium ore resources development, technical exchanges, and investment cooperation. On December 4, SMM and the delegation headed to CleanTech Lithium for in-depth exchanges.

Corporate Voices

SMM and the delegation visited CleanTech Lithium, where they were warmly received by Ms. Marcela Sepúlveda, Community Relations Manager; Mr. Alvaro Florez, Legal Manager; and Mr. Jason Baverstock, Executive Strategy & Development. The company representatives provided a detailed introduction to their business development.

CleanTech Lithium holds exploration and development licenses in four major regions in Chile, covering a total area of over 1,250 square kilometers. CTL's flagship project, Laguna Verde, is considered highly commercially valuable based on the provided JORC resource estimates, with reserves of 1.8 million mt, equivalent to decades of production potential.

Technical Exchange

SMM and the delegation engaged in in-depth discussions with CleanTech Lithium on the progress of its projects, lithium carbonate, and future development trends in the lithium battery industry.

CleanTech Lithium is committed to producing battery-grade lithium with a unique ESG approach embedded throughout the process: from sustainable extraction without mining, no evaporation ponds, to complete return-to-state water replenishment. CTL's DLE pilot plant is being assembled at its R&D center in Copiapó, Chile. The government aims to accelerate commercial production, targeting the launch of new lithium projects by 2026.

Regarding the company's lithium projects in Chile, it was noted that two of its projects are located near mining areas in Chile. Both projects have completed scoping studies. The PFS of the fast-progressing project will be completed within a few months, with the goal of achieving full production by 2027. The second project is in the exploration phase, with plans to build a nearby substation, though progress has yet to be made.

According to previous data, the total operating cost of the company's Chilean projects was approximately $4,000/mt. However, since 2023, inflation may have led to an increase in operating costs.

Group Photo

After the factory visit, SMM and the delegation took a group photo with CleanTech Lithium, strengthening their cooperative friendship and paving the way for deeper exchanges and collaboration in the future.

Through this field trip, SMM and the delegation gained a deeper understanding of CleanTech Lithium's development status and a more profound insight into the market conditions, development trends, and challenges of the lithium battery industry in South America. They will continue to deepen cooperation with major enterprises to achieve complementary advantages and promote the development of the lithium battery industry.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
4 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
4 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
4 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
4 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
4 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
4 hours ago