SMM Daily: Lithium Carbonate Prices Surge on Nov 21, Market Remains Quiet

Published: Nov 21, 2024 12:00
【SMM Daily Review: Lithium Carbonate Prices Rise on November 21】
SMM battery-grade lithium carbonate index price was 79,262 yuan/mt, up 433 yuan/mt from the previous working day; battery-grade lithium carbonate was 77,800-81,000 yuan/mt, with an average price of 79,400 yuan/mt, up 350 yuan/mt from the previous working day; industrial-grade lithium carbonate was 75,650-76,650 yuan/mt, with an average price of 76,150 yuan/mt, up 500 yuan/mt from the previous working day. Currently, downstream material plants are not very clear about the actual order situation in the future, coupled with the year-end destocking expectations, resulting in a weakening sentiment for recent purchases, mainly adopting a cautious wait-and-see attitude. Upstream lithium chemical smelters have a strong sentiment to stand firm on quotes, and there is a significant gap in psychological expectations between upstream and downstream. Overall, the actual transaction situation in the market is relatively quiet. It is expected that the spot prices of lithium carbonate will continue to show sideways movement in the future.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
10 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
10 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
10 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
10 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
10 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
10 hours ago