The Operating Rate of Secondary Copper Rod Plants Declined Significantly Due to Policy Disturbances [SMM Analysis]

Published: Nov 4, 2024 13:22
Source: SMM
According to SMM survey, the operating rate of secondary copper rod plants last week was 15.51% (surveyed enterprises: 18, capacity: 1.94 million mt/year), down 4.9 percentage points WoW.

According to SMM survey, the operating rate of secondary copper rod plants last week was 15.51% (surveyed enterprises: 18, capacity: 1.94 million mt/year), down 4.9 percentage points WoW. Last week, the average price difference between copper cathode rod and secondary copper rod was 706 yuan/mt, down 189 yuan/mt compared to 895 yuan/mt two weeks ago. The average discount of secondary copper rod against copper futures in Jiangxi last week was 248 yuan/mt, up 194 yuan/mt WoW.

According to SMM survey, the decline in the operating rate of secondary copper rod plants last week was due to the gradual restriction on the input invoice quota for secondary copper rod plants in Anhui, affecting continuous operations. Additionally, the prices of copper scrap and finished products remained inverted last week, with most secondary copper rod plants delivering 1-2 truckloads of finished products per day and preferring to purchase externally to fulfill orders. In November, the copper anode processing fee was 600 yuan/mt, the blister copper RC was 1,000 yuan/mt, while the secondary copper rod processing fees were compressed to 200 yuan/mt last week. However, secondary copper rod plants indicated that regardless of the finished product, production and sales would result in losses. Currently, they continue operations to fulfill long-term contracts; otherwise, they would prefer to shut down and resume production when the price difference between copper cathode and copper scrap widens. As of Friday, November 1, the price difference between copper cathode and copper scrap was 967 yuan/mt, up 157 yuan/mt WoW.

Looking ahead to this week, secondary copper rod plants expect the operating rate in November to be better than in October. As the year-end approaches, enterprises' bidding projects enter the delivery period, and end-use orders may improve.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Kazakhstan's Copper Cathode Output Down 9.1% YoY in Jan-Feb 2026, Feb Production Drops 7.8% MoM
11 hours ago
Kazakhstan's Copper Cathode Output Down 9.1% YoY in Jan-Feb 2026, Feb Production Drops 7.8% MoM
Read More
Kazakhstan's Copper Cathode Output Down 9.1% YoY in Jan-Feb 2026, Feb Production Drops 7.8% MoM
Kazakhstan's Copper Cathode Output Down 9.1% YoY in Jan-Feb 2026, Feb Production Drops 7.8% MoM
Data released by the Kazakhstan Bureau of Statistics showed that Kazakhstan's copper cathode production in January-February 2026 fell 9.1% YoY.Copper Cathode: February 2026 production was 35,625 mt, down 7.8% MoM; total production in January-February was 74,266 mt, down 9.1% YoY.
11 hours ago
HBIS Resources: Severe Flooding Hits South African Copper Mines; Phase I Resumes, Phase II Dewatering Ongoing
11 hours ago
HBIS Resources: Severe Flooding Hits South African Copper Mines; Phase I Resumes, Phase II Dewatering Ongoing
Read More
HBIS Resources: Severe Flooding Hits South African Copper Mines; Phase I Resumes, Phase II Dewatering Ongoing
HBIS Resources: Severe Flooding Hits South African Copper Mines; Phase I Resumes, Phase II Dewatering Ongoing
HBIS Resources (000923) announced on March 17 that the Limpopo Province of South Africa, where its subsidiary Palabora Copper (Pty) Ltd. is located, and the neighboring Mpumalanga Province had been hit by the most severe flooding disaster since 2000. As runoff from the open pit and surrounding catchment areas surged into the company’s mine workings, some tunnels in Phase I and Phase II of the copper project were flooded, causing some critical facilities to be submerged (with no casualties). As the operating area of Copper Phase II is located at a deeper level, dewatering has progressed relatively slowly, and dewatering operations are still underway, with completion expected in early April.
11 hours ago
US Economic Advisor Kevin Hassett: Oil Tankers Passing Strait of Hormuz, Situation Under Control
11 hours ago
US Economic Advisor Kevin Hassett: Oil Tankers Passing Strait of Hormuz, Situation Under Control
Read More
US Economic Advisor Kevin Hassett: Oil Tankers Passing Strait of Hormuz, Situation Under Control
US Economic Advisor Kevin Hassett: Oil Tankers Passing Strait of Hormuz, Situation Under Control
Kevin Hassett, Director of the White House National Economic Council in the US, said that oil tankers had "already begun to pass sporadically" through the Strait of Hormuz, and that if necessary, the scale of a globally coordinated release of strategic petroleum reserves could be expanded. Speaking on CNBC, he said the White House had formulated response plans for every stage of supply chain disruptions, and said he was "very confident that the current situation is under control and will end soon."
11 hours ago
The Operating Rate of Secondary Copper Rod Plants Declined Significantly Due to Policy Disturbances [SMM Analysis] - Shanghai Metals Market (SMM)