Caixin PMI Returns to Expansion Territory, SHFE Zinc Focus Shifts Upward [SMM Zinc Morning Comment]

Published: Nov 04, 2024 09:27 (GMT+8)
Source: SMM
Last Friday, LME zinc opened at $3,088/mt.

Last Friday, LME zinc opened at $3,088/mt. Initially, with bulls increasing their positions, LME zinc fluctuated upward. Subsequently, with bears increasing their positions, LME zinc declined, hitting a low of $3,023/mt during European trading hours. Later, as bears reduced their positions, LME zinc fluctuated upward again, reaching a high of $3,088/mt during the night session. However, it lacked upward momentum and its focus fell back, ultimately closing up at $3,066/mt, an increase of $28.5/mt or 0.94%. Trading volume decreased to 12,774 lots, and open interest fell by 2,911 lots to 252,000 lots. Last Friday, LME zinc recorded a bullish candlestick, with LME inventory increasing by 350 mt to 247,075 mt, a decrease of 0.65%. On the macro front, US October non-farm payrolls data was unexpectedly weak, enhancing the likelihood of an interest rate cut, weakening the US dollar, and shifting LME zinc's focus upward. LME zinc is expected to fluctuate at high levels today.

Last Friday, the most-traded SHFE zinc 2412 contract opened at 25,030 yuan/mt. Initially, SHFE zinc briefly touched a high of 25,390 yuan/mt. Subsequently, lacking upward momentum, SHFE zinc's focus shifted downward to 24,985 yuan/mt, fluctuating and consolidating, hitting a low of 24,890 yuan/mt during the period. It ultimately closed up at 24,970 yuan/mt, an increase of 105 yuan/mt or 0.42%. Trading volume decreased to 126,000 lots, and open interest fell by 2,714 lots to 109,000 lots. Last Friday, the most-traded SHFE zinc contract recorded a long upper shadow bearish candlestick. Macro sentiment revived, with US non-farm payrolls data unexpectedly weak, reigniting expectations of a US Fed interest rate cut. Domestic Caixin PMI data returned to expansion territory, shifting SHFE zinc's focus upward. Attention still needs to be paid to the backwardation structure, and SHFE zinc is expected to fluctuate at high levels today.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Oct 02, 2026 14:34 (GMT+8)
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Read More
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Coherent launched PhotonLink, an integrated optics platform for AI infrastructure incorporating Indium Phosphide (InP) lasers, silicon photonics, detectors and optical modules. The company disclosed more than 10 CPO engagements, over 10 NPO engagements and more than five chip-to-chip connectivity projects, with anchor customers and long-term agreements secured for both CPO and NPO. Revenue is expected to begin ramping in Q4 2026. Coherent has shipped over 300 million InP lasers and is expanding its 6-inch InP manufacturing capacity to support the ramp. The customer pipeline provides a clearer commercial demand signal for InP devices and upstream materials, although additional capacity and indium consumption were not disclosed.
Oct 02, 2026 14:34 (GMT+8)
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Oct 02, 2026 10:40 (GMT+8)
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Read More
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Minerals announced that JDS Energy & Mining had completed a preliminary underground inspection at its wholly owned Talisman project in Washington State. No immediate impediment to safe re-entry was identified, and mineralization including sphalerite was observed near the portal and adit. More than 200 soil samples await results. Significant underground work still requires detailed geotechnical assessment, support design and stope inspection. Mineral observations do not establish grade, continuity, tonnage or economic potential.
Oct 02, 2026 10:40 (GMT+8)
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Oct 02, 2026 10:39 (GMT+8)
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Read More
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Windfall Geotek announced renewal of 592 hectares of claims in Canada’s Bathurst Mining Camp. Zinc targets at Upper Sprig Brook were generated using an AI model trained on zinc-copper assays from seven local volcanogenic massive sulphide deposits. The company plans historical-data compilation and rock or soil sampling to advance target validation and subsequent drill targeting. No new drilling assays or mineral resource estimate were announced.
Oct 02, 2026 10:39 (GMT+8)