On September 20, 2024, the Chinese and foreign teams of the Kinsevere mine under MMG Limited jointly witnessed the successful production of the first batch of cathode copper using sulfide ore as raw material, marking the completion and commissioning of the main body of the Kinsevere mine expansion project. Cao Liang, CEO of MMG Limited, said, "The Kinsevere mine expansion project has been safely and successfully completed within the scheduled time and budget, once again demonstrating MMG's strong international mining project construction and delivery capabilities. I warmly congratulate and sincerely thank the Kinsevere mine and expansion project teams. We look forward to Kinsevere achieving full integration of the beneficiation plant, roasting and acid-making systems with the existing hydrometallurgical system and enhanced production capacity within the next 12 months, and realizing the project's expected investment return goals as soon as possible. When the project reaches full production, it will produce 80,000 tonnes of cathode copper annually.