SMM Commentary: Lithium Carbonate Prices Soar Amid Production Fluctuations, Market Sentiment Mixed

Published: Sep 11, 2024 12:09
[SMM Daily Commentary: Rise in Lithium Carbonate Prices on September 11]
The SMM battery-grade lithium carbonate index price stood at 73,027 yuan/ton, marking an increase of 716 yuan/ton from the previous working day. The price range for battery-grade lithium carbonate was 71,800-75,000 yuan/ton, with an average price of 73,400 yuan/ton, up 950 yuan/ton from the previous working day. Industrial-grade lithium carbonate ranged from 68,500 to 70,000 yuan/ton, averaging 69,250 yuan/ton, an increase of 1,000 yuan/ton from the previous working day. Sentiment in the lithium carbonate spot market was influenced by fluctuations in production, prompting some upstream lithium salt factories to raise their quotes accordingly. The transaction focus for spot purchases by downstream material factories with rigid demand shifted notably upwards, while other material factories maintained their previous lower price points. The psychological expectations of upstream and downstream parties regarding transaction prices continued to diverge. Considering the actual supply-demand situation and cumulative inventory levels for the month, lithium carbonate spot prices may continue to fluctuate within a range.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
46 mins ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
46 mins ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
49 mins ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
49 mins ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
50 mins ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
50 mins ago