Lithium Carbonate Prices Slide Further Amid Oversupply Concerns, Despite Steady Demand

Published: Sep 4, 2024 12:01
[SMM Daily Commentary: Lithium Carbonate Prices Decline on September 4]
The SMM battery-grade lithium carbonate index price was 73,705 yuan/ton, a decrease of 201 yuan/ton from the previous working day; the price range for battery-grade lithium carbonate was 72,200-75,500 yuan/ton, with an average price of 73,850 yuan/ton, down 200 yuan/ton from the previous working day; industrial-grade lithium carbonate ranged from 69,100 to 70,200 yuan/ton, averaging at 69,650 yuan/ton, also a decline of 200 yuan/ton compared to the previous working day. The transaction price center of the lithium carbonate spot market continued to shift downwards. Despite the sustained positive downstream demand, material factories and battery cell factories have slightly increased their spot purchases. Upstream lithium salt factories are still primarily focused on maintaining prices, but some have slightly reduced their quotations due to inventory pressure. Overall, the lithium carbonate spot trading market has shown slightly increased activity. Given the current oversupply situation, lithium carbonate prices are expected to remain weak.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
6 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
6 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
6 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
6 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
6 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
6 hours ago