【SMM Bulletin】Bulletin on new price points for 3.44/3.72 MWh DC-side energy storage systems in the US

Published: Sep 2, 2024 19:35
Source: SMM
With the rapid development of the energy storage market in North America, large-scale energy storage systems have formed a stable market in the United States. U.S.-based and national offshore companies are also actively launching their respective energy storage system products in the U.S. to meet the booming downstream demand...

Dear Users:


SMM and its global branches have always been committed to reducing transaction risks and transaction costs in the energy storage market, and constantly improving and deepening the energy storage industry chain research.


In order to facilitate energy storage upstream and downstream enterprises better to understand the changes in the U.S. energy storage market and reflect the price of the market spot market promptly, we have conducted continuous research. Based on the research results obtained by SMM and the support from our partners, we intend to publish the weekly price of 3.44/3.72MWh DC-side energy storage system in the US from September 13th for market reference. Prices will be displayed for the first time at 11 a.m. GMT.


New Energy Sector Research Department & SMM Global UK
September 2nd, 2024


Shanghai Dept: Thomas Feng, fengdisheng@smm.cn (GMT+8)
London Office: Eden Liu, edenliu@smm.cn (GMT/BST)

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
14 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
14 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
14 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
14 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
14 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
14 hours ago
【SMM Bulletin】Bulletin on new price points for 3.44/3.72 MWh DC-side energy storage systems in the US - Shanghai Metals Market (SMM)