Sungrow Power Supply Posts H1 2024 Energy Storage Revenue of RMB 7.816 Billion, Gross Margin Soars 12.61% to 40.8%

Published: Aug 26, 2024 09:16
【Sungrow Power Supply Achieved Revenue of RMB 7.816 Billion with Gross Margin of 40.8% in Energy Storage Business in the First Half of 2024】On the evening of August 23, Sungrow Power Supply released its report for the first half of 2024. In the energy storage sector, Sungrow achieved revenue of RMB 7.816 billion in the first half of 2024, accounting for 25.20% of its total revenue. The operating revenue decreased by 8.3% year-on-year, while the gross margin reached 40.8%, a year-on-year increase of 12.61%. Currently, the company's power supply and energy storage systems are widely used in mature power markets such as Europe, the Americas, the Middle East, and the Asia-Pacific region, continuously strengthening the deep integration of wind, solar, and storage. None of the energy storage projects participated in by the company has experienced a safety incident, and it has accumulated extensive application experience in areas such as frequency regulation and peak shaving, supporting renewable energy grid connection, microgrids, commercial and industrial, and residential energy storage.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
4 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
4 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
5 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
5 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
5 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
5 hours ago