【SMM Analysis】 A Review of This Week's Lithium Carbonate Price Trends (2024.07.22-2024.07.26)

Published: Jul 26, 2024 11:32
Source: SMM
This week (2024.07.22-2024.07.26), the spot price of lithium carbonate dropped significantly. The SMM battery-grade lithium carbonate index price fell from 86,038 yuan/mt to 84,709 yuan/mt, a decrease of 1,329 yuan/mt. Supply and demand side, the surplus is a foregone conclusion, and the current fundamentals of lithium carbonate continue to be weak.

This week (2024.07.22-2024.07.26), spot prices for lithium carbonate dropped significantly. The SMM battery-grade lithium carbonate index price fell from 86,038 yuan/mt to 84,709 yuan/mt, a decrease of 1,329 yuan/mt. The low-end price for battery-grade lithium carbonate dropped from 84,400 yuan/mt to 82,900 yuan/mt, the high-end price fell from 88,300 yuan/mt to 86,800 yuan/mt, and the average price decreased from 86,350 yuan/mt to 84,850 yuan/mt, a drop of 1,500 yuan/mt. For industrial-grade lithium carbonate, the low-end price fell from 80,800 yuan/mt to 79,200 yuan/mt, the high-end price dropped from 82,000 yuan/mt to 80,600 yuan/mt, and the average price decreased from 81,400 yuan/mt to 79,900 yuan/mt, a drop of 1,500 yuan/mt.

Bullish and bearish news from the Chilean earthquake and the U.S. presidential election came simultaneously, making it unclear which side had the upper hand. As a result, both lithium carbonate futures and spot market prices fluctuated significantly this week. Although material plants' long-term contracts and customer supply can meet basic production needs, there is no clear intention to stockpile overall. However, with the current downward trend in lithium carbonate prices, some material plants and traders are buying on dips. Some lithium salt plants, worried about future price trends, have eased their previous price-supporting sentiment to avoid excessive inventory buildup, making their quoting behavior more active.

From the actual supply and demand situation, an oversupply is indeed a foregone conclusion, and the current fundamentals of lithium carbonate continue to run weak.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
13 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
13 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
13 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
13 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
13 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
13 hours ago