SMM Zinc Market Morning Comment (Jul 22)

Published: Jul 22, 2024 09:30 (GMT+8)
Source: SMM
Last Friday, LME zinc opened at $2,809.5/mt, reaching a high of $2,816/mt, then hitting a low of $2,768.5/mt, and eventually closed at $2,774/mt, down $23/mt, a decrease of 1.25%.

Last Friday, LME zinc opened at $2,809.5/mt, reaching a high of $2,816/mt, then hitting a low of $2,768.5/mt, and eventually closed at $2,774/mt, down $23/mt, a decrease of 1.25%. The trading volume decreased to 10,320 lots, and the open interest was reduced by 1,058 lots to 223,000 lots. Last Friday, LME zinc recorded a bearish candlestick, with LME inventory decreasing by 2,325 mt to 240,275 mt, a drop of 0.96%. The strong performance of the US economy pressured LME zinc downward. Concerns about zinc consumption emerged amid oversupply. It is expected that LME zinc will run weak today.

Last Friday, the most-traded SHFE 2409 zinc contract opened at 23,335 yuan/mt, briefly dipping to 23,325 yuan/mt, then reaching a high of 23,445 yuan/mt, and eventually closed at 23,355 yuan/mt, down 95 yuan/mt, a decrease of 0.41%. The trading volume decreased to 67,897 lots, and the open interest was reduced by 593 lots to 92,840 lots. Last Friday, SHFE zinc recorded a bullish candlestick. The 20th Third Plenary Session did not release more positive news, but domestic inventory continued to decrease. SHFE zinc is expected to fluctuate today.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
16 hours ago
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Read More
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Coherent launched PhotonLink, an integrated optics platform for AI infrastructure incorporating Indium Phosphide (InP) lasers, silicon photonics, detectors and optical modules. The company disclosed more than 10 CPO engagements, over 10 NPO engagements and more than five chip-to-chip connectivity projects, with anchor customers and long-term agreements secured for both CPO and NPO. Revenue is expected to begin ramping in Q4 2026. Coherent has shipped over 300 million InP lasers and is expanding its 6-inch InP manufacturing capacity to support the ramp. The customer pipeline provides a clearer commercial demand signal for InP devices and upstream materials, although additional capacity and indium consumption were not disclosed.
16 hours ago
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
20 hours ago
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Read More
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Minerals announced that JDS Energy & Mining had completed a preliminary underground inspection at its wholly owned Talisman project in Washington State. No immediate impediment to safe re-entry was identified, and mineralization including sphalerite was observed near the portal and adit. More than 200 soil samples await results. Significant underground work still requires detailed geotechnical assessment, support design and stope inspection. Mineral observations do not establish grade, continuity, tonnage or economic potential.
20 hours ago
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
20 hours ago
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Read More
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Windfall Geotek announced renewal of 592 hectares of claims in Canada’s Bathurst Mining Camp. Zinc targets at Upper Sprig Brook were generated using an AI model trained on zinc-copper assays from seven local volcanogenic massive sulphide deposits. The company plans historical-data compilation and rock or soil sampling to advance target validation and subsequent drill targeting. No new drilling assays or mineral resource estimate were announced.
20 hours ago