American Salars Acquires Pocitos Lithium Salar Project

Published: Jun 20, 2024 23:09
Source: SMM
On 17 June, American Salars Lithium Inc.announced the acquisition of a 100% interest in the Pocitos 1 Lithium Salar Project from Recharge Resources.

On 17 June, American Salars Lithium Inc.announced the acquisition of a 100% interest in the Pocitos 1 Lithium Salar Project from Recharge Resources. The project, located near Pocitos in Salta, Argentina, spans 800 hectares and contains an inferred 760,000-tonne lithium carbonate equivalent (LCE) mineral resource, based on a December 2023 NI 43-101 Mineral Resource Estimate (MRE).

The acquisition terms include the issuance of 5,000,000 common shares of American Salars to Recharge Resources, subject to a 24-month escrow. Additionally, American Salars will assume up to USD $250,000 in outstanding tax liabilities and pay AUS $80,000 for the MRE. The project includes a 2.5% net smelter royalty (NSR) on produced minerals, with an option for American Salars to purchase 1.5% of the NSR for CAD $1.5 million.

The Pocitos 1 project, along with its neighboring Pocitos 2 block, has undergone extensive exploration, including surface sampling, trenching, geophysics, and drilling. The company plans to update the MRE and commence new drilling once permits are issued by the Salta Mines Department, aiming to advance the project towards production.

(Revised on 24 June to correct transaction details)

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Feb 7, 2026 20:47
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
Feb 7, 2026 20:47
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Feb 7, 2026 20:44
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
Feb 7, 2026 20:44
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Feb 7, 2026 20:44
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
Feb 7, 2026 20:44
American Salars Acquires Pocitos Lithium Salar Project - Shanghai Metals Market (SMM)