LiCarbonate Daily Jun 6

Published: Jun 6, 2024 23:47
Source: SMM
On June 6, lithium carbonate futures rose 0.80% to 101,150 yuan/ton (~13,951.72 USD/ton). The battery-grade index fell to 101,172 yuan/ton (~13,954.76 USD/ton).

Headline Figures:

Futures:

Opening Price: 100,300 yuan/ton (~13,834.48 USD/ton)

Closing Price: 101,150 yuan/ton (~13,951.72 USD/ton)

Daily Change: +0.80%

Volume: 95,005 contracts

Open Interest: 159,275 contracts (decreased by 8,858 contracts)

Spot Market:

Battery-Grade:

SMM Index: 101,172 yuan/ton (~13,954.76 USD/ton)

Price Range: 99,300 - 103,500 yuan/ton

Average Price: 101,400 yuan/ton (~13,986.21 USD/ton)

Daily Change: -600 yuan

Industrial-Grade:

Price Range: 96,500 - 98,800 yuan/ton

Average Price: 97,600 yuan/ton (~13,462.07 USD/ton)

Daily Change: -650 yuan


Market Trends:

Futures Performance: The main 2407 futures contract experienced a downward trend in the morning but rebounded in the afternoon due to bullish market forces, closing up by 0.80%.

Spot Market Activity: Some lithium salt producers slightly lowered their quotes, but the price reductions were minimal, and prices remained concentrated near higher levels, reflecting a firm pricing sentiment. Downstream cathode manufacturers remained cautious about purchasing due to the risk of inventory value decline if prices continue to fall. This led to limited purchasing activity and a slight overall decline in spot prices.

Market Insights:

Upstream Producers:

Minimal adjustments to quotes were observed, reflecting firm pricing attitudes among lithium salt producers.

Downstream Buyers:

Cautious purchasing behavior continues, driven by concerns over potential further price drops and their impact on inventory values. Most buyers prefer to wait for more stable market conditions.

Conclusion: The lithium carbonate market remains in a state of cautious optimism, with slight gains in futures and minimal activity in the spot market. Both upstream and downstream players are navigating a challenging landscape, balancing price expectations with market realities.

* You can subscribe to LiCarbonate Daily and it will be sent to your email daily; To subscribe, simply send an email to me : robinhe@smm.cn *

If you have any questions regarding the recent movement of lithium carbonate market (e.g. what caused it and how this can affect your business), or would like to know more comprehensive pricing info on Lithium Carbonate. Please feel free to reach out to me:

Robin He

SMM Li-ion Battery Materials Department

E: robinhe@smm.cn | T: +86-21-51595884

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
1 hour ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
1 hour ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
1 hour ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
1 hour ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
1 hour ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
1 hour ago