Copper prices rose on domestic macroeconomic support [SMM copper morning comment]

Published: May 20, 2024 10:05
LME copper prices opened at $10482.5/mt last Friday evening before reaching a low of $10470/mt and a high of $10720/mt, and closed at $10715/mt, a rise of 3.31%. Trading volumes were 33,000 lots and open interest stood at 341,000 lots.

LME copper prices opened at $10482.5/mt last Friday evening before reaching a low of $10470/mt and a high of $10720/mt, and closed at $10715/mt, a rise of 3.31%. Trading volumes were 33,000 lots and open interest stood at 341,000 lots. The most active SHFE 2407 copper contract prices opened at 84530 yuan/mt and finished at 85270 yuan/mt overnight, up 2.38%, with the low-end of 84420 yuan/mt and the high-end of 85430 yuan/mt. Trading volume was 93,000 lots and open interest stood at 229,000 lots. On the macro level, in order to lower the threshold for residents to buy houses, the People's Bank of China (PBOC) issued three notices in a row, canceling the national floor policy on interest rates for commercial personal housing loans for the first and second homes, lowering the interest rate on personal housing provident fund loans by 0.25 percentage points, and adjusting the minimum down payment ratio for commercial personal housing loans for the first home to no less than 15%, and for the second home to no less than 25%. In terms of fundamentals, as copper prices continued to rise, the purchasing demand of processing companies was suppressed and market activity remained low. After the subsequent warehouse receipts are released, the spot supply will be more abundant, and it is expected to continue to impact the premiums and discounts. Due to the influence of macro sentiment, copper prices will move at highs in the near future.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
AI Computing Power Demand Boom Fuels Continuous Climb in Copper Foil Operations; Copper Cable High-Speed Connectors Strengthen, Taichenguang Leads Gains [SMM Express]
5 hours ago
AI Computing Power Demand Boom Fuels Continuous Climb in Copper Foil Operations; Copper Cable High-Speed Connectors Strengthen, Taichenguang Leads Gains [SMM Express]
Read More
AI Computing Power Demand Boom Fuels Continuous Climb in Copper Foil Operations; Copper Cable High-Speed Connectors Strengthen, Taichenguang Leads Gains [SMM Express]
AI Computing Power Demand Boom Fuels Continuous Climb in Copper Foil Operations; Copper Cable High-Speed Connectors Strengthen, Taichenguang Leads Gains [SMM Express]
5 hours ago
Tertiary Minerals Completes Phase 4 Drilling at Zambia’s Mushima North Copper Project
6 hours ago
Tertiary Minerals Completes Phase 4 Drilling at Zambia’s Mushima North Copper Project
Read More
Tertiary Minerals Completes Phase 4 Drilling at Zambia’s Mushima North Copper Project
Tertiary Minerals Completes Phase 4 Drilling at Zambia’s Mushima North Copper Project
Tertiary Minerals Plc has completed its Phase 4 drilling programme at Target A1 within the Mushima North Project in Zambia, with early portable X-Ray Fluorescence (pXRF) results identifying further copper mineralisation and supporting previously identified higher-grade zones.​ The Phase 4 programme comprised 3,639 m of drilling across 39 holes. Early results included an intersection of 15 m grading 0.53% copper from 100 m depth, including 7 m at 0.77% copper. Additional intersections included 4 m at 0.68% copper and 8 m at 0.62% copper, while broader infill intersections returned 65 m at 0.23% copperand 83 m at 0.16% copper.​ Mushima North is a polymetallic silver-copper-zinc prospect located within Zambia’s prospective Iron-Oxide-Copper-Gold region, approximately 28 km east of the historic Kalengwa copper-silver mine. The latest drilling supports the previously identified near-surface Exploration Target of 15–30 million tonnes grading 40–60 g/t silver equivalent, while also providing further indications of higher-grade copper and silver mineralisation within the target area.​ Samples from the drilling programme have been submitted for independent laboratory testing, with certified results expected to be released as they become available. Remaining pXRF results from the final nine holes are also expected, covering additional infill drilling at Target A1 and exploration of mineralisation west of Target A1 and at Target A2.​ With Phase 4 drilling now complete, the project is moving into its next stage of technical evaluation. Initial metallurgical testwork is expected to commence shortly, followed by data compilation and resource modelling. Tertiary Minerals is targeting the delivery of a JORC-compliant Mineral Resource Estimate for Mushima North before the end of 2026, which would provide a clearer assessment of the scale and grade distribution of the mineralised system following the latest drilling campaign.
6 hours ago
Copper Mineralisation Extends Beyond Current Resource at Zambia’s Mumbezhi Project
6 hours ago
Copper Mineralisation Extends Beyond Current Resource at Zambia’s Mumbezhi Project
Read More
Copper Mineralisation Extends Beyond Current Resource at Zambia’s Mumbezhi Project
Copper Mineralisation Extends Beyond Current Resource at Zambia’s Mumbezhi Project
According to foreign media reports, step-out drilling at the Nyungu Central deposit within Zambia’s Mumbezhi Copper Project has returned further copper intersections, extending a newly identified mineralised zone southeast beyond the boundaries of the current Mineral Resource Estimate (MRE).​ Recent drilling returned 65.8 m grading 0.42% copper from 226 m, including higher-grade intervals of 17.0 m at 0.58% copper and 13.2 m at 0.82% copper. A separate intersection returned 29.6 m grading 0.34% copper from 237 m, including 5.2 m at 0.80% copper. The results extend the known copper system outside the current resource estimate and provide additional targets for continued exploration.​ A total of 16 Phase 3 diamond drill holes covering 4,723 m have so far been completed at the southern end of Nyungu Central, while priority assay results remain pending for seven holes. In addition, a 6,200 m infill diamond drilling programme commenced at Nyungu Central in late July, supported by an additional drill rig now on site.​ Exploration is also continuing across the wider Mumbezhi Project, with four diamond drill rigs currently operating. Three are focused on Nyungu Central, while another is drilling at the regional Sharamba prospect, where exploration is targeting shallow copper mineralisation associated with a strong airborne electromagnetic anomaly. Visual copper mineralisation has been observed in five holes drilled along approximately 700 m of strike on the western side of the anomaly.​ The latest intersections further extend the known copper mineralisation beyond the existing Nyungu Central resource boundaries, while several priority assay results remain outstanding. Continued step-out and infill drilling will provide further indications of the scale and continuity of the mineralised system and its potential to support future resource expansion at Mumbezhi.
6 hours ago