Lithium Argentina provides Cauchari-Olaroz and Pastos Grandes project updates

Published: May 17, 2024 17:34
Source: SMM
On 14 May, Lithium Americas (Argentina) Corp., the separated entity from former Lithium Americas Corp. announced its Q1 2024 earnings results.

On 14 May, Lithium Americas (Argentina) Corp., the separated entity from former Lithium Americas Corp. announced its Q1 2024 earnings results. The company now owns two lithium brine projects in Argentina, one being the operational Cauchari-Olaroz project which produces 4,500 tonnes of lithium carbonate in Q1 2024 and eyes expansion, and the second project, the Pastos Grandes, is still in development.

The Caucharí-Olaroz project is progressing well towards the target of producing 20,000 to 25,000 tonnes of lithium carbonate in 2024. No monthly production targets are disclosed, but the management assures that production volume and quality have been improved and will continue to do so with a healthy inventory level, which will be reflected in product pricing and operating costs for the rest of this year.

For Pastos Grandes, Direct Lithium Extraction (DLE) technology is discussed as a solution tailored to specific geological conditions with the support of Ganfeng. On 5 March this year, Ganfeng agreed to subscribe an expected 15% of the additional shares of Proyecto Pastos Grandes S.A (PGCO), the subsidiary of Lithium Argentina, for a consideration of not more than US$70 million. As part of the transaction terms, Ganfeng will lead the development and construction of the project.

Author: Hongqiu Su | Battery Metals Analyst Associate | London Office, Shanghai Metals Market
Email: lilysu@smm.cn

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
8 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
8 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
8 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
8 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
8 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
8 hours ago