First Release! CATL provides long-life batteries specially designed for loaders

Published: May 6, 2024 17:10
Recently, China Lonking (03339) held the debut offline ceremony of an electric loader equipped with CATL's new generation of long-life batteries at its headquarters in Longyan, Fujian.

Recently, China Lonking (03339) held the debut offline ceremony of an electric loader equipped with CATL's new generation of long-life batteries at its headquarters in Longyan, Fujian. This marks the first landing of CATL's loader-specific long-life battery in China Lonking. CATL stated that the long-life battery system launched by China Lonking is a new generation product specifically developed for the loader market by CATL, with significant improvements in service life, energy density, and performance under harsh conditions compared to the previous generation products: 1. Longevity: Using new generation long-life battery cells, the system's lifespan has increased by over 60%; 2. High energy: Integrated battery box structure + new battery cells, with an increase of over 30% in energy capacity; 3. High strength + corrosion resistance: High-strength battery box structure design, 1.5 times increase in mechanical strength, and the use of specially-designed anti-corrosion materials to adapt to various harsh conditions. It is reported that the construction machinery industry is one of the important areas in CATL's electrification layout. Electric loaders, with zero emissions, high efficiency, comfort, intelligence, and excellent fuel and electricity economy, have become the pioneers of electrification transformation in the construction machinery industry. It is expected that the penetration rate of electrification in the industry will exceed 20% by 2024. CATL stated that currently, there are more than 10,000 electric loaders equipped with the company's batteries, and over 300 loaders have worked for more than 20,000 hours. CATL's battery products have not only withstood the harsh conditions of construction machinery but also accumulated rich experience and big data resources. Currently, CATL's market share in the loader and construction machinery industry is over 90%.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
5 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
5 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
5 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
5 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
5 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
5 hours ago