【Xingyuan Material and Thai Polyacid Launch New Generation of Aramid-Coated Separators】

Published: Apr 28, 2024 20:17
Source: SMM
【Xingyuan Material and Thai Polyacid Launch New Generation of Aramid-Coated Separators】

On the morning of April 28th, Xingyuan Material, together with the coating material giant Thai Polyacid, jointly launched the new generation of SafeBM aramid-coated separators at their global new product launch event. It is understood that this separator uses the high-performance fiber material aramid as the main coating material, representing a new generation of heat-resistant high polymer coating technology following the ceramic coating and PVDF coating routes. The aramid material combines high structural strength, heat resistance, and low density. When used as a coating, compared to traditional ceramic-coated separators, the coated film has a 50% reduction in surface density, a 60% increase in puncture strength, nearly 30% improvement in insulation, and the rupture temperature is also increased from 153°C to around 260°C. Additionally, this coated film shows significant improvements in electrolyte wettability and liquid retention rate. Once used in battery manufacturing, it can effectively enhance the battery's safety performance, high and low temperature discharge capabilities, and cycle life.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
15 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
15 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
15 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
15 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
15 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
15 hours ago
【Xingyuan Material and Thai Polyacid Launch New Generation of Aramid-Coated Separators】 - Shanghai Metals Market (SMM)