Albemarle's 50,000-Ton Lithium Hydroxide Battery Materials Project in Sichuan Officially Commences Operations, Boosting New Energy Vehicle Production and Reducing Carbon Emissions

Published: Apr 28, 2024 13:32
Albemarle's Lithium Hydroxide Lithium Battery Materials Project in Sichuan with Annual Production of 50,000 Tons Officially Put into Operation
On April 26th, the lithium hydroxide lithium battery materials project with an annual production capacity of 50,000 tons, invested by the US-based Albemarle Corporation with US$900 million in Meishan, Sichuan, was officially put into operation. As Albemarle's largest fixed asset investment project in China, once the project reaches full production capacity, it is expected to generate an annual output value of RMB 5 billion, meeting the power demand of over 1.5 million new energy vehicles and reducing 100 million tons of carbon dioxide emissions within the battery life cycle. According to the production schedule, the project is expected to achieve a production capacity of 10,000 tons and an output value of approximately RMB 1 billion this year. Once the base is fully completed, it will play an important role in accelerating the construction of the new energy and new materials manufacturing base in the Chengdu-Chongqing region and promoting the high-quality development of the lithium battery industry in Meishan.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
2 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
2 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
2 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
2 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
2 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
2 hours ago