CMOC Updates Resource Reserves at Bikita Lithium Mine

Published: Apr 1, 2024 19:53
Source: SMM
CMOC announced the updated resource reserves at the Bikita Lithium Mine in Zimbabwe.

Recently, China Molybdenum Co., Ltd. (CMOC) announced the updated resource reserves at the Bikita Lithium Mine in Zimbabwe. As of December 31, 2023, the combined reserves (measured, indicated, and inferred categories) of lithium ore in the West and East zones of the Bikita Mine amounted to 113.35 million metric tons (excluding resources used for mine production), with a lithium metal content of 1.1679 million metric tons and an average grade of 1.03% Li2O, equivalent to 2.8847 million metric tons of lithium carbonate equivalent (LCE). Compared to the previous report (as of December 31, 2022), lithium ore reserves have increased by 47.9324 million metric tons, equivalent to an increase of 1.0469 million metric tons of LCE.

For more information, please contact: cathycai@smm.cn

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Rio Tinto posted an H1 profit of $6.85 billion, and Argentina’s three major salt lake lithium mine projects made new progress.
17 mins ago
Rio Tinto posted an H1 profit of $6.85 billion, and Argentina’s three major salt lake lithium mine projects made new progress.
Read More
Rio Tinto posted an H1 profit of $6.85 billion, and Argentina’s three major salt lake lithium mine projects made new progress.
Rio Tinto posted an H1 profit of $6.85 billion, and Argentina’s three major salt lake lithium mine projects made new progress.
On July 29, Rio Tinto announced its 2026 H1 results. According to the data, in H1, Rio Tinto's underlying earnings reached $6.85 billion, up 43% YoY; net profit was $6.66 billion, up 47% YoY. In H1, net cash generated from operating activities was $9.2 billion, underlying EBITDA was $14.8 billion, underlying ROIC was 17%, underlying earnings per share were 421.4¢, dividends per ordinary share were 211¢, and the payout ratio was 50%.
17 mins ago
What Is Liontown Signalling About Lithium Supply? 【SMM Analysis】
33 mins ago
What Is Liontown Signalling About Lithium Supply? 【SMM Analysis】
Read More
What Is Liontown Signalling About Lithium Supply? 【SMM Analysis】
What Is Liontown Signalling About Lithium Supply? 【SMM Analysis】
33 mins ago
Warm Isostatic Pressing Material Misalignment: The "Achilles' Heel" of Mass Production of Sulphide Solid-State Batteries [SMM Analysis]
15 hours ago
Warm Isostatic Pressing Material Misalignment: The "Achilles' Heel" of Mass Production of Sulphide Solid-State Batteries [SMM Analysis]
Read More
Warm Isostatic Pressing Material Misalignment: The "Achilles' Heel" of Mass Production of Sulphide Solid-State Batteries [SMM Analysis]
Warm Isostatic Pressing Material Misalignment: The "Achilles' Heel" of Mass Production of Sulphide Solid-State Batteries [SMM Analysis]
[SMM Analysis: Warm Isostatic Pressing Material Misalignment: The "Achilles' Heel" of Sulfide Solid-State Battery Mass Production] Warm isostatic pressing is the core process for solid–solid interface densification in sulfide all-solid-state batteries. However, the substantial differences in compressive modulus and plastic deformation among cathode and anode active materials, solid-state electrolyte, and copper and aluminum current collectors cause non-uniform creep and interlayer slip within the multi-layer structure under 600 MPa isotropic high pressure. This is tolerable in small laboratory cells, but when scaling up to large-capacity automotive-grade cells, the yield crashes. The solution priorities are clear: material modification (addressing the root cause) > process optimization (providing relief) > equipment upgrade (limited symptom treatment with a clear ceiling). The hardware gap for China's warm isostatic pressing equipment continues to narrow, but shortcomings remain in process databases and turnkey solutions. The industry is now in a window period for pilot-scale equipment procurement, and China's iteration pace is faster than that outside China. The long-term success of equipment suppliers depends on turnkey line solutions and partnerships with leading clients, while standalone machine performance is merely the entry barrier. Constrained by the material misalignment bottleneck, achieving full-scale solid-state battery integration at the million-unit level before 2030 is extremely difficult, with only small-batch demonstrations in high-end car models likely to appear from 2027 to 2029.
15 hours ago
CMOC Updates Resource Reserves at Bikita Lithium Mine - Shanghai Metals Market (SMM)