LiCarbonate Daily - March 28th

Published: Mar 28, 2024 22:26
Spot market stable at 107,500-112,000 yuan/ton, futures rose 0.88% to 108,500 yuan/ton, with 199,520 lots traded.

Spot Market Update:

On March 28th, the spot market for lithium carbonate remained stable. SMM reported that the price range for battery-grade lithium carbonate was 107,500-112,000 yuan per ton, with an average price of 109,750 yuan per ton, holding steady compared to the previous working day. Feedback from the industry indicated that there was a prevalent sentiment among lithium salt companies to maintain prices for spot transactions. Despite this, there were no significant changes in delivery prices compared to the previous day. Downstream companies, particularly cathode manufacturers, reported a trend of recent purchases by trading companies being for low-priced goods. Most trading companies were not acquiring high-priced spot goods from lithium salt companies, resulting in purchase prices similar to those of the previous day. Overall, the spot market transaction prices for lithium carbonate remained relatively stable.

Future Contract Analysis:

The main contract for lithium carbonate 2407 experienced a slight increase of 0.88% on March 28th. Data revealed that the main contract opened at 108,800 yuan per ton and closed at 108,500 yuan per ton, with a trading volume of 199,520 lots and an open interest of 199,818 lots, marking a decrease of 2,159 lots compared to the previous trading day. The day's trading pattern saw lithium carbonate prices sharply decline after the opening, followed by a rebound and rise until the early session concluded. Subsequently, after the midday session commenced, the main contract underwent a minor decline before stabilizing and oscillating steadily until the closing bell, ultimately recording a modest increase of 0.88%.

In conclusion, the lithium carbonate market exhibited stability in spot prices, with futures contracts recording a modest rise. Despite fluctuations, market sentiment suggests a balanced outlook.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
3 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
3 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
3 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
3 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
3 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
3 hours ago