Zhong'an Energy joins hands with NIO Energy to promote the construction of battery swapping, charging, and asset management systems

Published: Mar 25, 2024 19:52
Source: SMM
Zhong'an Energy joins hands with NIO Energy to promote the construction of battery swapping, charging, and asset management systems

On March 22, Zhong'an Energy (Anhui) Co., Ltd. (hereinafter referred to as "Zhong'an Energy") and Wuhan NIO Energy Co., Ltd. (hereinafter referred to as "NIO Energy") signed a cooperation agreement in Hefei, Anhui.

According to this agreement, the two parties will carry out all-round and multi-level in-depth strategic cooperation in areas such as battery standards, battery swapping and charging technology, construction and operation of battery swapping and charging networks, battery asset management and operation, cooperation in new power systems, and related supply chain cooperation for the production and manufacturing of battery swapping and charging equipment, to jointly promote the high-quality development of China's new energy vehicle industry.

According to the information, on January 11 this year, with the strong support of the Anhui Provincial Government, Zhong'an Energy was unveiled and is mainly responsible for promoting the "one network" of unified battery swapping and charging services across the entire province of Anhui, and building an open and shared new energy vehicle battery swapping and charging network. On the same day, Anhui Energy Group, Anhui Jiaokong Group and NIO reached a strategic cooperation to support the newly established Zhong'an Energy in building 1,000 integrated battery swapping and charging stations.

NIO stated that Zhong'an Energy and NIO Energy jointly signed this cooperation agreement to undertake the work of jointly promoting the construction of the battery swapping and charging system and the battery asset management system. This signing is a further advancement of the cooperation between the two parties after the establishment of Zhong'an Energy.

In the future, Zhong'an Energy and NIO Energy will be based in Anhui, radiate to the Yangtze River Delta region, and look nationwide. Following the principle of moderate advancement, they will orderly promote the construction of 1,000 integrated battery swapping and charging stations, build an open and shared battery swapping and charging energy network, and cooperate to establish an efficient battery asset management and operation system. The two parties will also cooperate on battery asset management and operation modes based on the innovative battery swapping model, support the promotion of Battery as a Service (BaaS), create a full life cycle management system for power batteries, establish and promote unified battery and battery swapping standards, carry out cooperation related to new power systems, and jointly promote the construction and development of the battery swapping and charging system and the battery asset management system.

It is worth noting that previously (on March 20), NIO had cumulatively laid out 200 highway battery swapping stations in the Yangtze River Delta region, with battery swapping services available in 92 cities. With Zhong'an Energy promoting the construction of 1,000 integrated battery swapping and charging stations, the battery swapping network in the Yangtze River Delta region will become even denser, enhancing the charging experience in the region.

According to NIO's financial report, in 2023, NIO achieved a record high revenue of 55.618 billion yuan, but the company's net loss further expanded by 43.5% to 20.72 billion yuan.

In the whole year of 2023, NIO delivered a total of 160,038 new vehicles, an increase of 37,552 units compared to 2022, representing a year-on-year increase of 30.7%.

In terms of infrastructure construction for battery swapping and charging, in 2023, NIO built 1,035 new battery swapping stations globally, bringing the cumulative number to 2,350. In 2024, NIO stated that it will build another 1,000 battery swapping stations and add 20,000 charging piles, with the fourth-generation battery swapping station starting to be deployed.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
19 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
19 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
19 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
19 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
19 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
19 hours ago