800 million yuan!The largest grid-side independent energy storage project with a single installed capacity!

Published: Mar 12, 2024 19:31 (GMT+8)
On the morning of March 11, the 200MW/400MWh grid-side energy storage project in Wuyi County, Jinhua City, Zhejiang Province officially started, which is also the largest grid-side independent energy storage project in Zhejiang Province, which is currently the largest grid-side independent energy storage project in Zhejiang Province, which was signed by Wuyi County, Jinhua City and Sunwoda Smart Energy, with a total planned investment of 800 million yuan. According to Shenzhen Sunwoda Smart Energy Co., Ltd. (hereinafter referred to as Sunwoda Smart Energy), on the morning of March 11, the 200MW/400MWh grid-side energy storage project in Wuyi County, Jinhua City, Zhejiang Province officially started, which is also the largest grid-side independent energy storage project in Zhejiang Province. The project was signed by Wuyi County, Jinhua City, Zhejiang Province and Sunwoda Smart Energy, with a planned total investment of 800 million yuan, and the project will be connected to the grid before June 30, 2024 according to the construction target.

On the morning of March 11, the 200MW/400MWh grid-side energy storage project in Wuyi County, Jinhua City, Zhejiang Province officially started, which is also the largest grid-side independent energy storage project in Zhejiang Province, which is currently the largest grid-side independent energy storage project in Zhejiang Province, which was signed by Wuyi County, Jinhua City and Sunwoda Smart Energy, with a total planned investment of 800 million yuan.
According to Shenzhen Sunwoda Smart Energy Co., Ltd. (hereinafter referred to as Sunwoda Smart Energy), on the morning of March 11, the 200MW/400MWh grid-side energy storage project in Wuyi County, Jinhua City, Zhejiang Province officially started, which is also the largest grid-side independent energy storage project in Zhejiang Province. The project was signed by Wuyi County, Jinhua City, Zhejiang Province and Sunwoda Smart Energy, with a planned total investment of 800 million yuan, and the project will be connected to the grid before June 30, 2024 according to the construction target.

Meng Xiangjun, general manager of Sunwoda Smart Energy, said at the groundbreaking ceremony: "Sunwoda (300207) actively responds to the national 'dual carbon' strategy, based on its own lithium battery manufacturing advantages, and focuses on the promotion of multiple types of energy storage application scenarios. The Wuyi project is the beginning of Sunwoda's strategic layout of energy storage on the grid side of Zhejiang Province, and it is also a benchmark demonstration project of energy storage for the group."

According to the data, on August 31, 2023, the Zhejiang Provincial Energy Bureau issued the "Notice on Issuing the New Energy Storage Installed Target Tasks before the Peak Summer of 2024", and the Jinhua Wuyi 200MW/400MWh grid-side energy storage project was included in the Provincial Energy Bureau's new new energy storage task plan before the peak summer of 2024, and the document clearly states that "the projects included in the list of projects in this notice are regarded as included in the 14th Five-Year Development Plan for New Energy in Zhejiang Province". At the same time, the project has been included in the 2024 major construction projects of Zhejiang Province to expand effective investment in the "thousands of trillions" project.

It is understood that after the completion of the project, it can accept power grid dispatching, effectively alleviate the intermittent and random impact of wind energy, photovoltaic and other energy sources on the power grid, and has significant advantages in peak regulation, frequency regulation, phase modulation and emergency backup, etc., which is of great significance for promoting green energy transformation, responding to extreme events, ensuring energy security, promoting high-quality energy development, and achieving the "double carbon" goal.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Smart Connected Vehicle Plans Roll Out; Going Global and Rising Penetration Rate Drive the Auto Sector
20 hours ago
Smart Connected Vehicle Plans Roll Out; Going Global and Rising Penetration Rate Drive the Auto Sector
Read More
Smart Connected Vehicle Plans Roll Out; Going Global and Rising Penetration Rate Drive the Auto Sector
Smart Connected Vehicle Plans Roll Out; Going Global and Rising Penetration Rate Drive the Auto Sector
Data shows that in August, auto production and sales rose more than 4% MoM, NEV production and sales increased about 18% YoY, and the penetration rate hit a new high of 60.6%. Exports exceeded 1 million units for three consecutive months, with YoY growth above 65%, and the share of NEV exports rose to 52%. The market share of domestic-brand passenger vehicles reached 77.76%, up more than 8 percentage points YoY.
20 hours ago
NARI Grid Orders Surge; Overseas Energy Storage Opens a Second Growth Curve
20 hours ago
NARI Grid Orders Surge; Overseas Energy Storage Opens a Second Growth Curve
Read More
NARI Grid Orders Surge; Overseas Energy Storage Opens a Second Growth Curve
NARI Grid Orders Surge; Overseas Energy Storage Opens a Second Growth Curve
Data shows that in H1 2026, NARI's revenue reached 27.767 billion yuan, up 14.54% YoY, with net profit attributable to the parent company at 3.073 billion yuan, up 4.08%. Newly signed contracts totaled 45.633 billion yuan, surging 28.79%. Overseas revenue reached 5.894 billion yuan, soaring 196.61%, and the company secured a 500MW-class energy storage EPC project in Oman.
20 hours ago
National cumulative installed power generation capacity reached 4.103 billion kW as of end-August
20 hours ago
National cumulative installed power generation capacity reached 4.103 billion kW as of end-August
Read More
National cumulative installed power generation capacity reached 4.103 billion kW as of end-August
National cumulative installed power generation capacity reached 4.103 billion kW as of end-August
As of end-August, the national cumulative installed power generation capacity reached 4.103 billion kW, up 11.1% YoY. Of this, solar power installed capacity was 1.299 billion kW, up 16.3% YoY, and wind power installed capacity was 693 million kW, up 19.6% YoY.
20 hours ago