The trade of polysilicon suspended before CNY, price stabilized, module production to be reduced in February

Published: Feb 6, 2024 13:48
Polysilicon: The mainstream prices of recharging polysilicon and dense polysilicon were 60-63 yuan/kg and 56-60 yuan/kg respectively. The polysilicon price index stood at 56.20 yuan/kg.

SHANGHAI, Feb 6 (SMM) -

Polysilicon: The mainstream prices of recharging polysilicon and dense polysilicon were 60-63 yuan/kg and 56-60 yuan/kg respectively. The polysilicon price index stood at 56.20 yuan/kg.

Supply and demand: With the completion of the new round of order signing, polysilicon prices were basically stable. Currently, the polysilicon trade has gradually stopped approaching the Chinese New Year. The market is mostly waiting to see the market changes after the Chinese New Year. The price before the holiday remains stable for the time being.

Module

In yesterday's market, the mainstream transaction price of bifacial-182mm monocrystalline PERC modules was 0.93 yuan/w, and the mainstream transaction price of bifacial-210mm monocrystalline PERC modules was 0.95 yuan/w.

Supply and demand: module prices were generally stable, and bid prices remained low. In February, many module companies showed a clear attitude towards reducing production. Market transactions gradually stopped before the Chinese New Year, and upstream and downstream business personnel generally took holidays, so prices were temporarily stable.

PV film

price

PV-grade EVA: The current trading price of domestic PV-grade EVA is around 11,000-11,100 yuan/ton, and the price remains stable. Actual transaction prices remained stable.

PV film : The current mainstream price of 420g transparent EVA film is 6.72-6.93 yuan/square meter, the price of 420g white EVA film is 6.26-6.47 yuan/square meter, the price of 380g EPE film is 7.56-7.94 yuan/square meter, and the price of 460g POE film is 13.34-13.80 yuan/square meter. Prices are less likely to change before the Chinese New Year.

Supply and Demand

PV-grade EVA: Before the Chinese New Year, some manufacturers will stop producing photovoltaic grade EVA and switch to produce foaming.

film: At present, the film factories are gradually going on holiday, and the market demand for LECO technology continues. module manufacturers remain optimistic about new technologies.

Inverters

Price: This week, the price of 20 kw grid-connected inverters was 0.15-0.19 yuan/W, the price of 50kw was 0.14-0.18 yuan/W, and the price of 110kw was 0.12-0.17 yuan/W.

Supply and demand: There is no overall change in the inverter price range, and the overall price remains stable. Before Chinese New Year holiday, various companies have closed one after another according to their own orders and production line production arrangements. Downstream procurement and delivery demand has been suspended, and prices have remained stable.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
China Approves 17.44 GW Power Plan for Qaidam Desert Base, Including Solar, Wind, and Energy Storage Projects
17 hours ago
China Approves 17.44 GW Power Plan for Qaidam Desert Base, Including Solar, Wind, and Energy Storage Projects
Read More
China Approves 17.44 GW Power Plan for Qaidam Desert Base, Including Solar, Wind, and Energy Storage Projects
China Approves 17.44 GW Power Plan for Qaidam Desert Base, Including Solar, Wind, and Energy Storage Projects
It is understood that the National Energy Administration has officially approved the power source allocation plan for the "Qaidam Desert Base (East Golmud) Base". The planned construction scale of the power source projects at this base is 17.44 million kilowatts, including 10 million kilowatts of photovoltaic power, 5 million kilowatts of wind power, 2.64 million kilowatts of coal-fired power, 0.1 million kilowatts of solar thermal power, and 1.5 million kilowatts (for 4 hours) of electrochemical energy storage. The total investment in the projects is about 86 billion yuan. The new energy will be transmitted to Guangxi through the "Qinghai-Guangxi DC" UHV power transmission project. Currently, significant progress has been made in the preliminary work of the "Qinghai-Guangxi DC" project, w
17 hours ago
[SMM PV News] Armenia Hits 1.1 GW Solar Capacity,
Feb 6, 2026 09:17
[SMM PV News] Armenia Hits 1.1 GW Solar Capacity,
Read More
[SMM PV News] Armenia Hits 1.1 GW Solar Capacity,
[SMM PV News] Armenia Hits 1.1 GW Solar Capacity,
Armenia’s cumulative solar capacity has surged to 1.1 GW following the addition of approximately 615 MW in 2025. This rapid expansion has pushed solar's share of electricity generation to around 15%, effectively meeting the country's 2030 target years ahead of schedule. The growth is heavily driven by a net-metering scheme supporting over 50,000 autonomous producers (totaling 650 MW), though the government ended loan subsidies for rooftop solar in July to shift focus toward battery storage.
Feb 6, 2026 09:17
Spot Market and Domestic Inventory Brief Review (February 5, 2026) [SMM Silver Market Weekly Review]
Feb 5, 2026 17:36
Spot Market and Domestic Inventory Brief Review (February 5, 2026) [SMM Silver Market Weekly Review]
Read More
Spot Market and Domestic Inventory Brief Review (February 5, 2026) [SMM Silver Market Weekly Review]
Spot Market and Domestic Inventory Brief Review (February 5, 2026) [SMM Silver Market Weekly Review]
Feb 5, 2026 17:36