[SMM Daily Review: Lithium Carbonate Prices Stable on February 5]

Published: Feb 5, 2024 17:45
Source: SMM
According to SMM, the SMM lithium carbonate battery-grade price index was RMB 95,801/mt on February 5, unchanged from the previous working day. The battery-grade lithium carbonate price range was RMB 943,000-998,000/mt, averaging RMB 971,000/mt, unchanged from the previous working day. The industrial-grade lithium carbonate price range was RMB 880,000-910,000/mt, averaging RMB 895,000/mt, unchanged from the previous working day. Affected by the quiet market atmosphere during the festival period, logistics and trading activities have basically stopped. Currently, downstream manufacturers have basically completed stocking up before the festival, and most small and medium-sized enterprises will start to suspend production this week. In addition, logistics have been hindered by weather and the Spring Festival, trading volumes tend to be light, and the whole market is in a stable state.

According to SMM, the SMM lithium carbonate battery-grade price index was RMB 95,801/mt on February 5, unchanged from the previous working day. The battery-grade lithium carbonate price range was RMB 943,000-998,000/mt, averaging RMB 971,000/mt, unchanged from the previous working day. The industrial-grade lithium carbonate price range was RMB 880,000-910,000/mt, averaging RMB 895,000/mt, unchanged from the previous working day. Affected by the quiet market atmosphere during the festival period, logistics and trading activities have basically stopped. Currently, downstream manufacturers have basically completed stocking up before the festival, and most small and medium-sized enterprises will start to suspend production this week. In addition, logistics have been hindered by weather and the Spring Festival, trading volumes tend to be light, and the whole market is in a stable state.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
12 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
12 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
12 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
12 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
12 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
12 hours ago